My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEG,t[ I E U <br /> F.In-Tank Gauging/SIR Equipment: <br /> N Check this box if tank gauging is used only for inventory contrMAR 15 2016 <br /> El Check this box if no tank gauging or SIR equipment is installed. <br /> ENVIRONMENTAL <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. 7 A ®,P7,N <br /> Complete the follqw!ng,chccklisf: <br /> V...... ... ..... <br /> Yes 1 ❑No d F No Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> .iYes F-1 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ElYes [E:1 No* Was accuracy of system product level readings tested? <br /> MOM <br /> ❑Yes F-1 No* Was accuracy of system water level readings tested? <br /> ❑ 's ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No* <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section if,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): FXJ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> .................. <br /> F]Yes For equipment start-up or annual equipment certification.was a leak simulated to verify LLD per form an ce?(Ch eck <br /> .❑.... ......... <br /> F-13gp.h.; ❑E]0.1gp.h;E]0.2 g.p.h. <br /> F-1 N�A all that apply)Simulated I eak rate: <br /> ----------- <br /> E]NoWere all LLDs confirmed operational and accurate within regulatory atory requirements? <br /> E:1 Yes <br /> ........❑.. ............. ......... <br /> ........................ .........--.................................. <br /> 11 El Yes In'No* Was the testing apparatus properly calibrated? <br /> ............ —------.............. -----------------= <br /> ............... <br /> lFor mechanical LLDs,does the LLD rest ri ct product flow if it detects a leak9 <br /> El Yes M No <br /> El N/A <br /> .... ............... ................. . . ....... .................... t.......... ......... ......... <br /> ........... -------- <br /> El Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> F-1 N/A <br /> .. ....... <br /> 11 ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off i f any portion of the monitoring system is disable or <br /> 0 N/A <br /> disconnected? <br /> ............... <br /> Ei <br /> .............. ........... <br /> El Yes El No* Forelectronic LLDs,does the turbine automatically shut offif any portion of the monitoring system malfunctions or <br /> fai Is a test? <br /> Ej N/A <br /> ................ ...... ........ <br /> i� Ej Yes M No Forelectronic IJ,Ds,have all accessible wiring connections been visual ly inspected? <br /> ❑N/A <br /> Yes ❑No Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ........ -------11,� ......... <br /> In the Section K below,describe how and when these deficiencies were or wig be corrected. <br /> H. Comments: <br /> Suction System <br />
The URL can be used to link to this page
Your browser does not support the video tag.