Laserfiche WebLink
FEDERAL REGULATIONS <br />_ t ®f SPCC pianw b <br />a a< tion m water. aw to so my the or W. 206lond Admieisteater. <br />WAW Of an 4101811m s( of hb sinal �. at[ tadM. . tt►i �1'" with <br />;113.5 1t fir leve ttift 11123. • facility subject t0 <br />aur � 1113,7 Y with Ills.! (a). (b) or (c) has: Discharged <br />1 AW 1Q.a. of oil m <br />flew + Cwn tD! (a) at, (a).own am ..,or the navltabie:waters, 'ot the <br />(a) er at (e) Owners W at ` fWWWHalted orates W a4wianj ehoralines m <br />and offshere faculties in operation an . Jumved" Oil In <br />bdwo the eR date of this part that 4tr to ta)6-1h) W(e) at 411101 Ovellst0or'dise <br />required pur-a ui quantities. in 40 Cm <br />bane W. due to .thus locru this aretican Isla a Part 110. onto oe upon the m►vfgable <br />UOIL OWN �i he av . #v s "emus• of till IN&" as —.6 V- . - <br />Ou m ui Quaatit(te. v <br />donned fa 40 CT'FArt•1�,10. Into w "m <br />XWWlW Y nOrnWlY attended <br />hours par day. or at the � d <br />VW navigablewaters of the UWW states <br />Oft@ it the facrilty is aft so attended. <br />m' 44101fda shorellnes. Shari prepare a <br />FroVeControl a tercfkft . <br />�1111FOC <br />add shall make such Pian • t0 <br />the R low for for on-site <br />Phan <br />Plan") to writing and in rginegisr« <br />roilew during normal w <br />(f ) 219 <br />. with <br />aeCUOU lis.?. XxC6Pt As Provided for in <br />Paragraph (f) of this section. such <br />at timL <br />(1) The RegionalAdministrator am <br />email be within six months <br />buan extension Of far the <br />after the effective date of this part and <br />flan full tati0n a( <br />shall be fully implemented se I 10 as <br />AID SF= pion beyond Me time pwmttW <br />)passible. but not later than roe yeas atter <br />She effective dao of this Pam <br />for the preparation and <br />of an BPCCVI&n Pursuant t0 <br />141 FR 12657. 26.19761 <br />(a). (b) ar (c) of Was section where be <br />(b) owners or Operators of Onshore <br />And offshore facilities that a Op- <br />An& flat the ownOr of Operator of • <br />facility subject to (a). (b) <br />CM140nal after the effeetive date Of this <br />pa <br />PAM and that have discharged or MW <br />or (a) of Was section cannot fully Cosa. <br />re"O"W be expected to <br />!n harmful quantities, as defined In 40 <br />ply with the rep ts Of this part <br />as a result Of either nonavailability of <br />CPR Part 110. Into or upon the navigable <br />waters Of the United States or Adjoiningbeyond <br />qualified personneL or delays in cm. <br />struction or equipment delivery b <br />b <br />shoreline, shall prepare as <br />the control nasi without the faun of stib, <br />In accondanra with 1112.7. 35teept is <br />Provided for in paragraph (f) of this see. <br />owner or operator or their respective <br />agents or employees. <br />tion. such B Plan •hall be <br />within sus months after the date such <br />(2) Any owner or operator seeking an <br />extension of time pursuant to paragraph <br />facility operations and shall be <br />fully Implemented as soon as possible. <br />(f) (1) of this section may submit a letter <br />of request to the Regional Administrator. <br />but not later than one year after such <br />facility begins operations. <br />Such letter shall Include: <br />(!) A complete copy of the SPCC plan. <br />(c) Owners or operators of onshore <br />and offshore mobile or portable faculties, <br />U completed: <br />(1I) A full explanation of the cause for <br />Such as onshore drilling or workover rigs. <br />barge mounted offshore drilling or work - <br />any such delay and the specific Aspects <br />of the SPCC Plan affected by the delay: <br />over rigs. and portable fueling faculties <br />(lu> A full discussion of actions being <br />shall prepare and Implement an SPCC <br />taken Or contemplated to manimin or <br />Plan as required by paragraphs (a). (b) <br />mutkate such delay; <br />.and (d) of this section. The owners or <br />operators of such facility need not pre. <br />(1v) A proposed time schedule for the <br />Implementation of anyemsective actions <br />fare a new SPCC Plan each time the <br />faculty is moved to a new site. The <br />being taken or contemplated, Including <br />Plan may be a general plan. prepared In <br />accordance with 112.7, using gond <br />Interim for completion of tests or <br />studies. Installation and operation of arty <br />Lice.section <br />engineering practice. When the mobil* or <br />equipment or preventive <br />Portable facility to moved. It must be lo. <br />measuraL <br />Cared and Installed using the Will pre- <br />In addition. such owns oro may <br />vention practices outlined in the Sp= <br />Present additional oral or written state - <br />Plan for the faculty. no mobs: or part- <br />menta In support of his letter of request. <br />We facility subject to this regulation <br />(3) The submission of a letter of re. <br />Shall operate unless the 8PCC Plan has <br />quest for extension of time pllmment to <br />been lrnptemented. 7h: SpcC Plan shall <br />Pusersob (f) (s) of this section shall in <br />only apply while the faculty Is In a Axed <br />no way relive the owner Or Operator <br /><non- rtation) opelltine <br />We obligation to comply with the <br />141 FR 12657. March 26. 19761 <br />"Quirements Of 11123 (a). (b) or (c). <br />Whom extendon at time L Authorized <br />(d) No effective, <br />to astisiy the requirements of this part <br />by <br />by the Regional Administrator for Par. <br />titular equipment or other gWWc as- <br />Wdess It has been reviewed by a <br />tered ProfessionalZnglnOtr and Corti® <br />poets of the SpM pIM Bucy, extension <br />shall In no way affect the owuer's or op - <br />fled to by such Professional Engineer. <br />BY means of this certification the en• <br />orator's obligation to comply with the <br />requirements of 1112.3 (a). (b) or (c) <br />Meer. having examined the fatuity And with respect to other equipment or other <br />being familiar with the provisions of this specific Aspects of the SPCC Plan for <br />the has <br />Part shall Atta�with <br />Prepared accordance <br />which an extension of time has not been <br />expresslybeen auth <br />Enree•e..n•nt Rq►•ee•o <br />In two spill erents, refortabua <br />under IKAIOD 311(b) (5) of the FWPCA, <br />within any twelve month pe" <br />clod, the Owner Or Operator Of such ta" <br />qty shall Submit to the Regional Ad- <br />s from the time <br />such ty beton a subject <br />1ect to this sec. <br />tam the following: <br />(1) Name of the faculty; <br />(s) Name(s) at the owner or operator <br />«3) 4catiofacultya <br />Uof the facility: <br />(4) Date sad year of Initial facility <br />operation: <br />(5) Alaximum stoup or handling cm-' <br />Of the facility and normal dally <br />(6) Description of the facility, includ <br />Ing maps, now diagrams, and topoaraph- <br />Ical maps: t <br />(7) A leo copy of the SPCC Plan <br />with any amendments. <br />(g) The csuse(s) Of such sp111, lnclud• <br />Ing a failure Analysis of system or sub- <br />system In which the failure occurred; <br />(9) The corrective actions and/or <br />countermeasures taken, Including an <br />adequate description of equipment ry <br />Pairs and/or replacements; <br />(10) Additional preventive measures <br />taken or contemplated to nanimlse the <br />Possibility of recurrence: <br />(11) Such other Information as the <br />Regional Administrator may reasonably <br />require Pertinent to the Plan or spill <br />event <br />(b) Section 112.4 shall not apply until <br />the expiration of the time permitted for <br />the preparation and implementation of <br />an SPCC Play Pursuant to 1112.3 (a). <br />(b). (c) and (f). <br />(c) A complete copy of an information <br />Provided to the Regional Administrator <br />Pursuant to Paragraph (a) of this section <br />shall be sent at the same time to the <br />Stan agency In charge of water pollu- <br />tion control activities In and for the <br />State In which the fatuity is located. <br />Upon receipt of such Information such <br />State agency may conduct a review and <br />make recommendations to the Regional <br />Administrator as to further procedurek <br />methods, equipment and other require- <br />ments for equipment necessary to pre - <br />Vent and to ca)Wa discharges of oil <br />from such facility. <br />(d) After review of the SPCC Plan for <br />a facility subject to paragraph (a) of <br />this section, together with all other In- <br />formation submitted by the owner or <br />Operator of such facility, and by the <br />State agency under paragraph (c) of <br />this section, the Rel0onal Ad - <br />%or may require the owner or operator <br />of such facility to amend the SPCC Plan <br />If he finds that the Pian does not meet <br />the requirements of this part or that <br />the amendment of the Plan is neces- <br />180C. 112AW11 62 <br />