Laserfiche WebLink
..el, rva.LV 1 iwry rnLwtrd&&UN <br />y Prevent and to Con <br />at an in= such facuft. wqmcbum <br />as WM pba. he sha aft* U110 &P <br />CMtY operator by certified mall A - <br />Ilk of by personal Irl the ta{sMV <br />,owner of Woperator,he proposes <br />MQUIM anamendment to the Plea. <br />d" specify this torms t It the facility owner f e a . <br />r opers'. <br />SM in a corporation. a copy at an& <br />UOUM shall On be malloil to the <br />seat if W of M& corpor"IM <br />In the Stay 'WhM snob tumty is to, <br />Cated. wnthbf 20 days bane recow at <br />such notice, the facility owner er <br />tae 10047 submit writtenv1Mmfo <br />Atter a� Um <br />considering all relevant <br />p ted, the tiegi0aaai matMtW <br />yrW <br />ahW notify the taCmty of open. <br />for of am am t at shall <br />ruftd the . The ant re- <br />QuIred by thin PANIOnAl tratar <br />became,shall Part of the plan 20 daiys <br />aftw such MUM Unless the <br />AdministrMw. for good as ­* Shall <br />Specify another effective data, The <br />Or Operator of the facility <br />shall ftsple- <br />mant the amendment of the Pias as soon <br />w Possible. but sot tabs than Sia <br />mantas attar the <br />plat of the Plan. unless the Regional Ad - <br />for specifies another, day, <br />(f) An Omer or operator may oppal <br />a decision made by the Regional Admin. <br />istmtor requiring an amendment to an <br />WCC Plan. The appeal shalt be M&& to <br />the Administrator w the united States 1112.7 fess 'to: the <br />Environmental Protection and sed teepl tefoa of a pw <br />mustays t be made 1a writing within 20 d� Control and Cmc <br />of receipt of the notice from theRegional <br />tmtos sequtri-0 tae amendment The <br />A Complete Copy of the appeal mu{t be SPOC Plan shall tbaUghThe pias, bine aCarefully <br />seat to the Regional for at theaccordance <br />time the appeal to made. 7`h* appeal &ban with good onginoCrIng Pmcticok and <br />contain a clear and Concise statement which has the cult aPProvat of <br />the issues and points of tact in the Cage. MG ® with authority to <br />It may also containadditional informa- <br />tion from the owner or operator. or from emus for additional facilities of D3•n <br />any other person. The Administrator or dully oDem Or equipment not yet <br />his designee may request additional Is- i be <br />formation from the oro tor,Iscin "Palsy hs. and <br />or from any other - the details of Installation and opera. <br />tmtor or his designee shall reader a de- nonan Start -UP should be explained esp. <br />cision Within 60 dawn of receiving the ap- amtsly- The OOMPlst41 8PCC P1en shW <br />Deal and shall notify the owner or*pen- follow the "Gumm ou below. and <br />Star of his decision, Include a discussion of the facmb'a am- <br />fOrMAUCe with the appropriate guidelines <br />(a) A facility which bas experienced <br />Coe or Owe Spill events within t"" <br />months prior to the effective day of this <br />Out should include a written deacrip. <br />am of each such spill. Corrective setion <br />taken sad place for preventing <br />(b) WhM experience Indicatu a raa- <br />sonable (Such u tank potential tune, failure <br />or lftk- <br />60). the Plan Should Include a pre- <br />diction of the dlrectiom my of now, and <br />total Quantity of oil which could be dis. <br />charg-04 from the facility as • roult of <br />each or Of tabun. <br />(c) Approprl&U <br />structures iof t to <br />dive <br />Prevent dischargad on from reaching & <br />navigable water course should be Dro- <br />ol the following MMU" <br />6•aaa _ <br />131:0833 <br />I 112.2 (0- (b) ter (0) shoill empift ®""doe am "mum of heantift oubjec <br />ed iUs m"vivslMt 41=14 a: be <br />ft"M and "Ono= of <br />at IWA cc" ever "MUM" Ma hun CC *squil- <br />daft so* I" omat s_ <br />...�..e to this p to eoatala �� <br />faultt of " and a�.Mike. this 0wM W "Maw me <br />MYMif��Y{ <br />••-- `-' (�Nlll�. <br />Ot tt�.'.� to Incelude own Mei/ rral :gnar <br />mom Contrel <br />u•(l) hWill dam"* <br />` ', an taoi kelthood lty. h = it Such tfth <br />an <br />d< :he at the <br />(a) NO am V1 <br />dall be effective to t0 the requim <br />ts at this it bas <br />g000rdam With 1112•i(d)• <br />112.6 for VIalselm <br />0a Fotbeloe <br />Own <br />to 1112.=(W f (b) or O mtka, viola* <br />failing ._nftdM this 112 by <br />my of <br />the MweAMS 09 1112.2. 11amply 1112.44 or <br />1112.5 shall be for a ctvll ty off <br />not than 15.500 tar day Mush <br />vi tion >n nes. CifII Penalties diall <br />accadance with <br />dune at out in 114 of this nab. <br />chapW A <br />141 FR 126S7. Wreb 26, 19761 <br />1 1123 Amendsoost of $Dill t ou <br />trol <br />Conand Countenneamps <br />owners or operato"L <br />(a) Owner or operators of facilities <br />FAbJmeadt the to 1112.1 (a). (b) or (C) shall <br />IliIn accordancewith 1 11OPM Plan 2.? sucw enever <br />facility <br />then Is & change If facility COn• <br />5trUCtIOn- <br />ntenance <br />which materially <br />affects the facility's <br />Potential for the dincharle of an Into or <br />Won then is wslarg of the United <br />States 94JOIAft shorelines. Such <br />amendments shall be fully implemented <br />Y Boos u possible. but no- lays Man <br />sin mantles atter such change occum <br />(b) Notwithstanding with <br />Paragraph (a) Of this action. ownery <br />K: (iv) Wake. or 0UM barriers <br />(flatfttanum <br />d! <br />(2) <br />bat <br />has <br />IN) �, <br />(d) :< m <br />tallatim of or thin t� <br />III it l" 1112.(a) to t discharged <br />reaching the aaf sibie waters <br />e fGedwe taduir. the ownerany ar operatoror <br />iT trate Such 'lm - <br />PM 4 and provide the MOW- <br />) A Xh=ff ca <br />Idlowl" the <br />100. provision,of 40 CVR Fart <br />(2) A written commitment of man - <br />Power. equipment and materials re- <br />quired to expeditiously control and re- <br />mote my QuMtttr of Oki dis- <br />(e) In addition to the mookod <br />fenti listed under 1112.7 <br />(C). sections of the Plan should Include <br />wComplete diwl§W Of conformance <br />ith the fOUOwIMapplicable guidelines, <br />other effective NPM PrITIMUOU and am- <br />t with rnl (or. it mon stain- <br />): a• Cns and <br />guldelJoes(1) Pacititp drataw (oashon): (es- <br />Chldtnp PrOductift !acuities) • (1) Dmin- <br />80e from diked S d be <br />restrained by Valva or other positive <br />means to prevent a Spill or other esoes- <br />give leakage of all into the <br />drains" as - <br />6m Of 111101040; eftent treatment <br />tem. exceptto plan leaks"Rich am de- <br />signedWas my be emptied by oreJ� <br />�: ver. she be or <br />activated and the condition of the accu- <br />mulatton Should be examined <br />starting to be sum no oft will a di�s- <br />Charged Into the wmw. <br />(1i) drain valva should <br />not be used to drain diked anal. Valva <br />UW for the drainage of diked areas <br />should. u tar as PnwUMt, be of man- <br />uai. t OPOn-An4rclosed desim when <br />Plandraing," drains dlr� Into <br />W not Tato wastewater <br />treatmeat plants, retained storm avatar <br />should be Insvected u provided in para - <br />(e) (2) Uel) (8. C D) before <br />dMinaft <br />pili <br />Should. If possible, now tato <br />or catchment <br />to reWn Wes return it to the <br />hdUty. Catchment boning should not be <br />IOC&W In areas subject y Periodic <br />(tv) Ifu above, t &XIthe Is Anal knot m- <br />gineffed harge at <br />all in -Plant ditches should be equipped <br />with • di Could. Is <br />627.76 GPyrisht O 1976 by The Bureou of National Affairs, Inc. <br />IBM112.Tp)(tlftrll q <br />