Laserfiche WebLink
UIL rVLLUI lurt rr rvtI%1IUrt <br />4 (S) An tank battery andaw tn" <br />. Ar aw enterm content• or � nor <br />JM tan* K fessible. or alternate syde= <br />such Y Uwe outlined In 1 11=.9(0 (2) <br />weds f in • b( <br />a <br />(C) All o0 should Irk <br />oompatent Per. <br />soli tot � `and an, <br />nanoe on a <br />that <br />are ace tdaum am supports he grount <br />� <br />(D) New and old tart battery - <br />tions Y tut Y be tan - <br />We or Opdated Into a tan - <br />We <br />should be $IV= to <br />oaf of the foli • <br />(l) Adequate tank capacity to <br />that a tank will not overfill should <br />>�per/gauger be in �- <br />regular rounds. <br />(!) Overflow equalizing lines between <br />UWM so that a tun tank Can to <br />an adjacent tank. <br />(f) Adequate vacuum to <br />prevent tank � during a VWOUDO <br />t1a(4) nigh to generate and <br />truLamit an alum signal to the computer <br />where facilities are • part of - COMPAW <br />Production control <br />(Iv) Fwaity trouter operations. oil <br />IN IUCHM facility (otuhore). (A) All <br />groundabove valves and pipelines should <br />be examined peri on a scheduled <br />basis for general condition of items such <br />AS joints. valve glands and bodles, <br />drip pans, p! su <br />wen rod bases. bleeder and <br />gau" valves. <br />(S) Balt water (oil held ) dis- <br />posal facilities should be often. <br />particularly t a sudden in <br />atmospheric temperature to detect pos- <br />sible is that Could cause an <br />W discharge. <br />(C) Production facilities should have <br />® Of Bowline mala to <br />prevent spills from this source. The Pro- <br />gram should include c <br />examinia- <br />tions- a tion. Bowline re- <br />placement. and adequate records. Y app <br />p (6)Oiill'drilli g and r fvidual `twilitia <br />(onshore) (I) Mobile Or workover <br />equipment should be positioned or lo- <br />Cated so as to prevent spilled oil gram <br />reaching navigable waters. <br />ql) on the location, catch- <br />ment basins or diversion structures may <br />be to Intercept and contain <br />&Phis of fuel. oil. or oily drilling <br />fluids. <br />(W) Before below any Casing <br />string or during workover operations, a <br />blowout prevention (SOP) assembly and <br />well control should be Installed <br />that is capable of strolling any well <br />head Pressure that Is expected to be <br />encountered while that BOP assembly Is . <br />On the well. Casing and SOP Installations <br />should be In acro with to reg- <br />alatory agency requirements. <br />9.1®1 <br />131:0935 <br />or <br />...Y • (a) woe and ace "well shut- <br />MOO=VdM and la UK •t the to u_ <br />WQdWM de!>i• . F abonld be suitlelerAls a�,ed to <br />Iff*M Of o: in <br />® ums. combination of <br />►. leaf or scan <br />.. Wmam for <br />+wear it" SONoperated b! ® while not peke of <br />(n) 4i1 t' be by flit own" or <br />�` � <br />Wed <br />to oontrdl (XI)dfMft below <br />emu punkmOwftand ® �T <br />tlN t4bow ablowout VMOMWt ss mbly and <br />MM t4 R tree � tike , that Control Is Capable of <br />tacnitq be ooa and that b controlling W men. <br />toward • Central that nor to be tris <br />t to an the well. and 80P Insmftum <br />Provenecaft is <br />"Wratdt of on Into the oa should be In with State reg- <br />we watells of the United ia. <br />drains l sumps err <br />en contained In not (1111) Zz ass well control meas - <br />should d.ollection t ties b, ed should sour- <br />to prevent overnow. <br />Mics conditions. Including Brea lows of <br />(9!) For taCW a o(�'In'. The of Control �utem M. <br />IMP and dralas should be so- UM with 0=- <br />•nd • or 0quly and d <br />mmftud@d that surface <br />h liquid from the .Went metbW should a and to >n L L� W.�. • <br />UM <br />oil � qct A shut --in have redundant <br />or -tan <br />UM preventive as <br />ached- MWY vft B am safety <br />and should be employed that will not Bow but should may not be needed In producing <br />ei was <br />to assure reliable Operation <br />removalsystem and of theStartp Q0. liquid ti by able Beate <br />tionm <br />vice. Redundant automatic sump pumps cath!) >b Order that there will be no <br />and control devices may be required on misunderstanding of joint and <br />Dome Installa duties and tions to perform w� <br />tr�T) In Grow when separatm and In • sate pollution free maaaer, <br />ped with dump valva written <br />InstrJeUMS repared <br />Whose Predominant of failure is in by the owner or stor foorr contractors <br />the Closed position and pollution risk Is and subcontractors to follow whenever <br />high, the facility should be spw4any "WPped to prevent the of on. oaatract aaactivitiesactivitiesse a <br />Include ervicing <br />This Could be accomplished bye well ursesq rat <br />v iructlt servicing <br />a <br />acid <br />the SAM line to a diked use if the gog. Procedures should be maintained at the <br />rotor is now shoes. equipping ishigh liquid sothat wwith a ol res Production facility. Under Cer- <br />ill auto- twin dretimstanow and conditions such <br />maticaW shut-in wells Producing to the contractor activities may require the <br />valva. or other <br />undant dump at the facility of an authorised <br />Prevent on feasible alternatives to r ap tative of theowner <br />MAtmospheric storage or who would IneviaL <br />tervene when a to <br />should be equipped with prevent a spill <br />sensing devices Y other � (�®D � manifolds (headers) should <br />Lives vi prevent ail al- be equipped with valves on Indi- <br />(h)"dual Bowline. <br />with high and low should be equippeddi- (r) If the shut-in well Pressure is <br />essure <br />vices to activate an and/or cons greater than the working Pressure of the <br />troI the now or other leo Bowline and manifold valves up to and <br />tive top t oil - Including We header valva associated <br />(vli) Tanks should be equipped with with that individual Bowline. the Bow - <br />suitable corrosion protection. lion should be "UIPPed with a high pres- <br />(vlll) A written procedure for Inspect.Suredevice and shutin valve at <br />Int testing pollution prevention the wellhead unless provided with a pres- <br />BUMequipment and systemsshould be Paredora relief sys to Prevent over puss• <br />Duch andg. <br />4 at the facility. Cervi) All pipelines appurtenant to the <br />Procedures should be included Y facility should be Protected from coero- <br />Part of the 6PCC Plan _ such Y protective <br />ttx) Prevenstingtion <br />and tlon of or ca protection, should <br />lution prevention equipment wad systems be disc <br />at the facility should be conducted by the (zvii) Sub-nuuUe pipelines appurten. <br />owner or operator on a schedules - ant to the facility should be adequately <br />odic basis ser commensuratewith the�R against environmental strewn <br />PlexitY.conditionscirc acts • • such as fishing <br />the facility or other appropriate a- (xvw) Bub-martne pipelines appurten- <br />ant to the facility shoule be In good <br />Copyrisht C 1973 by The Bureau of Notional Affairs, Inc. 19 <br />