My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Does the system use a preset threshold that is automatically activa ed or that automatically turns <br /> on an alarm? <br /> (X)yes (If yes, skip question 11) <br /> ( )no (If no, answer question 11) <br /> 11. Does the system measure and report the quantity? <br /> (X)yes ( )no <br /> If so, is the output quantity converted to flow rate in gallons per hour? <br /> (X)yes ( )no <br /> 12. What is the specified line pressure during a test? <br /> (X) operating pressure of line <br /> ( ) 150% of operating pressure <br /> ( ) a specific test pressure of psi <br /> Test Protocol <br /> 13. What is the minimum waiting period required between a delivery of product to an underground <br /> storage tank and the start of the data collection for a pipeline leak detection test? <br /> (X)no waiting period <br /> ( ) less than 15 min <br /> ( ) 15 min to 1 h <br /> ( ) 1to5h <br /> ( ) 6to12h <br /> ( ) 12 to24h <br /> ( ) greater than 24 h <br /> ( )variable (Briefly explain.) <br /> 14. What is the minimum waiting period required between the last dispensing of product through the <br /> pipeline and the start of the data collection for a pipeline leak detection test? <br /> (X)no waiting period <br /> ( ) less than 15 min <br /> ( ) 15 min to 1 h <br /> OIto4h <br /> ( )4to8h <br /> ( ) greater than 8 h <br /> ( )variable (Briefly explain.) <br /> 15. What is the minimum amount of time necessary to set up equipment and complete a leak <br /> detection test? (Include setup time,waiting time and data collection time. If a multiple-test <br /> sequence is used, give the amount of time necessary to complete the first test as well as the total <br /> amount of time necessary to complete the entire sequence.) <br /> 14 minutes h(single test) <br /> h(multiple test) <br /> 16. Does the system compensate for those pressure or volume changes of the product in the pipeline <br /> that are due to temperature changes? <br /> (X)yes ( ) no <br /> Description-Pipeline Leak Detection System Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.