My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Is there a special test to check the pipeline for trapped vapor? <br /> ( )yes (X)no* <br /> *System is designed to eliminate trap2ed vapor. <br /> 18. Can a test be performed with trapped vapor in the pipeline? <br /> (X)yes ( ) no <br /> 19. If trapped vapor is found in the pipeline, is it removed before a test is performed? <br /> ( )yes (X)no <br /> 20. Are deviations from this protocol acceptable? <br /> ( )yes (X) no <br /> If yes,briefly specify: <br /> 21. Are elements of the test procedure determined by on-site personnel? <br /> ( )yes (X) no <br /> If yes,which ones?(Check all applicable responses.) <br /> ( )waiting period between filling the tank and the beginning of data collection for the test <br /> ( ) length of test <br /> ( ) determination of the presence of vapor pockets <br /> ( ) determination of"outlier" (or anomalous) data that may be discarded <br /> ( ) other(Describe briefly.) <br /> Data Acquisition <br /> 22. How are the test data acquired and recorded? <br /> ( )manually <br /> ( )by strip chart <br /> ( )by computer <br /> (X) by microprocessor <br /> 23. Certain calculations are necessary to reduce and analyze the data. How are these calculations <br /> done? <br /> ( )manual calculations by the operator on site <br /> ( ) interactive computer program used by the operator <br /> ( ) automatically done with a computer program <br /> (X) automatically done with a microprocessor <br /> Description-Pipeline Leak Detection System Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.