Laserfiche WebLink
Attachment 3 <br /> Summary of the Configuration of the Pipeline System(s) <br /> Used in the Evaluation <br /> Pipeline Leak Detection System <br /> Options 1, 2, and S <br /> Rigid Piping Tests <br /> S ecialized Test Facility,O erational Storage Tank S stem,or Computer Simulation <br /> Inside diameter of Ri2eline in. 3 in <br /> Leng±of 2i2eline tank to dis enser (ft) 200 ft <br /> Volume of 2roduct in line during testing al 86 g2l <br /> Type of material ifibeEglass,steel,other ' FRP <br /> Type of 2roduct in tank and 2i2eline(gasoline,diesel,other)2 Unleaded gasoline <br /> Was a mechanical line leak detector resent? es or no es <br /> Was trap2ed vapor resent? es or no In 3 of 59 tests conducted on the FRP <br /> Bulk Modulus B (psi) 34,443 <br /> BN si/ml 0.106 <br /> Stora a tank capacity al 600 gal <br /> Flexible Piping Tests' <br /> S ecialized Test Facility,O erational Storage Tank System,or Com uter Simulation <br /> Inside diameter of i eline Kin. 1.5 in <br /> Length of i elinetank to dispenser) ft 215 ft <br /> Volume of product in line during testing(gal) 19.7 Eal <br /> Ty2e of material fiber lass,steel,other ' Flexible <br /> IX2e of 2roduct in tank and 2i2eline(gasoline,diesel,other Z Unleaded asoline <br /> Was a mechanical line leak detector resent? es or no es <br /> Was tra ed vapor resent?(yes or no) no <br /> Bulk Modulus B ( si) 4,485 <br /> B/V si/ml 0.056 <br /> Storage tank ca aci al 600 gal <br /> 1 Specify type of construction material. <br /> 2 Specify type of product for each tank. <br /> 3 At total of 59 tests were conducted on the rigid pipeline. A total of 6 tests were conducted on the flexible <br /> piping to demonstrate the system's performance on flexible piping. <br />