My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />C QrPnVnAt2VP1P1W.TV!qT1NC- <br />"fest Method Developed BY: X Piping Manufacturer 0 Industry Standard o Professional. Engineer <br />rj Other (Specify) <br />Test Method Used: X Pressure 0 Vacuum D Hydrostatic <br />0 Other 6,pecify) <br />Test Equipment Used: Pressure Gauge"Winent <br />Resolution: 0-15 PSI <br />M <br />MMMMME.MMEMEMEEMSEEMEEMMM <br />EmEma Piping Run # 1 <br />Piping Material: Fiberglass <br />Piping Run # 2 <br />Em <br />Piping Run # 3 Piping Run # <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />6" <br />4" <br />3" <br />Length of Piping Run: <br />100, <br />1001 <br />110, <br />Product Stored: <br />Jet A <br />Jet A <br />Vent <br />Method and location of <br />piping -run <br />Test boot <br />Test boot <br />Test boot Test boot <br />.isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />Starting g test: <br />5 min <br />5 min <br />5 min 5 min <br />Test Start 'rime: <br />9:25 <br />8:50 <br />8:50 <br />Initial Reading (Rn): <br />5 PSI <br />S PSI <br />5 PSI <br />---------- - ' <br />Test End Time: <br />10:25 <br />9:50 <br />9-50 <br />Final Reading (R4.): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />I Hour <br />I Hour <br />I Hour I Hour <br />Change in Reading (RF -RI). <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 drop <br />I <br />0 drop <br />0 drop 0 drop <br />I <br />Test Result: <br />x Pass 0 Fall <br />x Pass I Fail <br />I x Pass 0 Fail 0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.