My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRC13-Jahuaty 2002 <br /> X)b Mime: Bank of Stockton <br /> 1941 IKE.Lockheed Ct. <br /> Stoticton,Ca <br /> Date: June 17,2009 <br /> Page 2 of 7 <br /> 4. TANK ANNULAR TESTING <br /> Test Method De—veiopeday; Tank manufacturer [X]Industry Standard Professional Engineer <br /> Other(specify) qio <br /> rest Method U§cd- Pressure Vacuum Hydrnstatic <br /> Other(Specify) <br /> Test-Eguiotient Used: Ashcroft Vacuum Gage PnmnmA-+ID—oltition- <br /> Tank# Tank 0 Tank# Tank 1#1 <br /> Ycs! <br /> Tank Exempt F'r?Jm ly <br /> Is T--�k!! Ves [X.1 No Ycs No y cs ;Nn Ycs WO <br /> No <br /> Testing.?l <br /> TankCa Material:aac' 10,000 Gallon <br /> rg <br /> Material:l: lbclasa <br /> Tank Manufacturer: <br /> Product Stored: Jet-A <br /> Wait time between applying <br /> 13t6ssure/vacuoth/Water and <br /> starting test: <br /> Test Start Tiffib: 10.00 am <br /> Initial Readitt RI 7 inch Vacuum <br /> Test End Time: 11:00 am <br /> Ir-hial Reading_M: 7 inch Vacuum <br /> Test Duration: I hour <br /> Change in ke-adi!%(Rf-RI) -0- <br /> Pass/Fail or <br /> Criteria; <br /> T ;pw"it- MYPASS.1 I FAIL 5F Fj VA IL 1. [PASS. ).FAIL I PASS.[ ]]FAIL <br /> Was sensor removed for r.Xl Y19S [. ]NO I IYPS I YES( I NO r. IVES[ ]NO <br /> N/A IN/A ]N/A N/A <br /> Was sensor properly replaced r.XJ V8S 1,N 101 Y.F-S I NO r ins [ jNO I YES[ I NO <br /> 5 ,N/� <br /> verified functionol after ['L]N/A .1 N/A NIA N/A <br /> 0)"iments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> I Seoondaty containment Systems where the continuous monitoring automaticany monitors both die primary and secondary containment such as sygellis <br /> that are hydrostatically nionitored or under constant vacuum, Fire exempt from periodic containment testing, (California Code of Rcgrulatlon,%Title 23, <br /> Section 2637(d)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.