My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.JanuAty 2002 <br /> Job: Bank 6f Stockton Page 3 of 7 <br /> 1941 E. Lockheed Ct <br /> Stockton,tockton,CA <br /> ,Date: June ll,2009 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: <br /> Engineer <br /> –Tij Industry Standard <br /> Test <br /> �71019 Manufacturer <br /> Engineer L J Professional <br /> 3 Other('3PCCjfY) <br /> Test Method Used, [XI Pressure jVacuum 114yar–o--iiiatic <br /> ( I Other(Specify) <br /> Piping Run. 1Piptng Run Piping Run Piping Run Piping Run <br /> Pi 'in Material; Fiber las4 Fibe Lass Fiberglass <br /> Pi in Manufacturer: A.0.Smith A.O.Smith A.O.Smith <br /> Pi in Diameter, 6"and 4"and 3 2'7 and 3"_ <br /> Lon th of Pi iri—Run: 85 ft 85 ft. 85 ft <br /> Product Stored: Jet-A, Jet-A <br /> Method and location of <br /> i in -run isolation: Test Boot. Test Boot <br /> Wait time between applying <br /> PMOure/vacuurn/water and <br /> startin test: <br /> Test Start Titne: –9:15 am 9:15 am <br /> Initial Reading1 5 Psi <br /> Test Edd Time: 10:15 am, 1.Os15 am <br /> Final Readin <br /> Test.Duration: _,1Hour I Hour <br /> Chan e in Re.adin Rf-R.1 0- <br /> Pass/Fail Threshold )r <br /> Criteria: <br /> N PAN <br /> ass Fail 11 NMI Ira I I – <br /> Comments–(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.