Laserfiche WebLink
SWRCB.JanuAty 2002 <br /> Job: Bank 6f Stockton Page 3 of 7 <br /> 1941 E. Lockheed Ct <br /> Stockton,tockton,CA <br /> ,Date: June ll,2009 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: <br /> Engineer <br /> –Tij Industry Standard <br /> Test <br /> �71019 Manufacturer <br /> Engineer L J Professional <br /> 3 Other('3PCCjfY) <br /> Test Method Used, [XI Pressure jVacuum 114yar–o--iiiatic <br /> ( I Other(Specify) <br /> Piping Run. 1Piptng Run Piping Run Piping Run Piping Run <br /> Pi 'in Material; Fiber las4 Fibe Lass Fiberglass <br /> Pi in Manufacturer: A.0.Smith A.O.Smith A.O.Smith <br /> Pi in Diameter, 6"and 4"and 3 2'7 and 3"_ <br /> Lon th of Pi iri—Run: 85 ft 85 ft. 85 ft <br /> Product Stored: Jet-A, Jet-A <br /> Method and location of <br /> i in -run isolation: Test Boot. Test Boot <br /> Wait time between applying <br /> PMOure/vacuurn/water and <br /> startin test: <br /> Test Start Titne: –9:15 am 9:15 am <br /> Initial Reading­1 5 Psi <br /> Test Edd Time: 10:15 am, 1.Os15 am <br /> Final Readin <br /> Test.Duration: _,1Hour I Hour <br /> Chan e in Re.adin Rf-R.1 0- <br /> Pass/Fail Threshold )r <br /> Criteria: <br /> N PAN <br /> ass Fail 11 NMI Ira I I – <br /> Comments–(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />