My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWR,C13.January 2002 'age 4 of 7 <br /> Site: Bank of Stockton <br /> 1941 C.Lockheed Ct. <br /> Stockton,CA <br /> Date! Jilne 17,2009 <br /> 6. PIPING SUMP'T'ES'TING <br /> Test Method Developed.By: [ ]Sump Nanufzcturer [x]Indus Standard <br /> Engineer m' f- ]Professional <br /> [ J Other(Specify) <br /> Test.Mdthod Used: [ ] pressure [ ] Vacuum I I-Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: CALMMML LEyEL GAUGE E ui melit Resolution: 0.0025 <br /> -!Sump Dimb'tcr: 48 inch 48 inch <br /> Sunt Depth: 36 inch 36 inch <br /> Sumt Material: Fibe lass Fiberglass <br /> Height from'Tank Top to Top of <br /> Highestmoin Penetration: 1.3 inch 16 inch <br /> Height from Tank Top to Lowest <br /> Electrical P6nctration: 10 inch 11 inch_ <br /> Condition ors um rior to testin D Dr <br /> Portion of Sum Testedl <br /> Docs turbine shut down when sump (Xj YES [ )NO [X]YRS I j Nd) <br /> sensor detebo Iiquid(both product& [ INA [ j NA [ ]NA <br /> wate [ j NA <br /> r 7 <br /> Turbinc shutdown response time: <br /> is system programmed for fail-safe [ I YES [ ]NO [I YRS[ ]NO [j YES[ ]NO [ ]Ypy <br /> shutdown? f.Xj NA ["Xj NA [ INA [ INA <br /> Was fail-safe verified to be ( j YES[ j NO [ ]YES[ j NO []YI:S[ ]NO f )YES[ )NO <br /> 0 orational? [ INA [ INA f j NA [ ]NA <br /> Wait time between applying <br /> pressstto/Vabnum/wA.tcr and starting <br /> test: <br /> Tcst Start Time. 9:45 am 11:15 sane_ <br /> lnitittl Readin Rl : 14 inch 17 inch <br /> Test Fnd Tithe: 10:15 am 1.1:45 am <br /> Final Reading 1.4 inch 17 inch <br /> Test Duration: 1 Hour 1 flour <br /> Change in Rcadin URI <br /> P939/Fail Threshold or Criteria: <br /> Tx9Sf Bi itlt;, [Rj,PASS [ ] FA:II; [x]•PASS ( I It, ( ] PASS [ ••I FAIL I. ]PLASS[ ]NO <br /> Was sensor rt;tnbved for testing? M YES [ ]NO [?+7 YES [ ]NO [ ]YRS ( I NO [ j Y_LIS [ ,j NO <br /> NA NA <br /> Was sensor ptoperly replaced and pq YES [ ]NO (x]YES [ 1 NO [ j YP—% [ ]NO [ j Y$[ ]NO <br /> verified functional after testing? [ ]N/A [ j N/A [ j N/A [ INA <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 1 If the emirc depth orthe sump is not tested,specify how much was tested, if the answer to any.of the questions tndicatcd with an asterisk(*)is "NO"or <br /> "NA",the entire sump must be tested. (SWRC13 L(.-,-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.