Laserfiche WebLink
SWRCB.January 2002 <br /> Job Name: Bank of Stockton <br /> 1941 E.Lockheed Ct. <br /> Stockton,Ca <br /> Date: June 17,2009 <br /> Page 2 of 7 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: [ ]Tank Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> [ ]Other(Specify) <br /> Test Method Used: [ ]Pressure [X]Vacuum [ ]Hydrostatic <br /> [ ]Other(Specify) <br /> Test Equipment Used: Ashcroft Vacuum Gage Equipment Resolution: '/4 in HG <br /> Tank# Tank# Tank# Tank# <br /> Is Tank Exempt From [ ]Yes [X] No [ ] Yes [ ] No [ ]Yes[ ] No ( ]Yes [ ]No <br /> Testing?1 <br /> Tank Capacity: 10,000 Gallon <br /> Tank Material: Fiberglass <br /> Tank Manufacturer: <br /> Product Stored: Jet-A <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 10:00 am <br /> Initial Reading(Rl): 7 inch Vacuum <br /> Test End Time: 11:00 am <br /> Final Reading(Rf): 7 inch Vacuum <br /> Test Duration: 1 hour <br /> Change in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: [X]PASS [ j FAIL ;[ ]PASS( ]FAIL [ ]PASS [ ]FAIL [ ]PASS [ ] FAIL <br /> Was sensor removed for [X]YES [ ]NO [ ]YES [ ] NO [ ]YES[ )TJO [ ]YES[ ]NO <br /> testing? [ ]N/A [ ]N/A [ ]N/A [ ]N/A <br /> Was sensor properly replaced [X]YES [ ]NO []YES [ ]NO [ ]YES [ ]NO [ ]YES[ ]NO <br /> &verified functional after [ ]N/A [ ]N/A [ ]N/A [ ]N/A <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems <br /> that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations,Title 23, <br /> Section 2637(a)(6)) <br />