My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Bank of Stockton <br /> 1941 E.Lockheed Ct <br /> Stockton,CA <br /> Date: June 17,2009 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ]Piping Manufacturer [X] Industry Standard [ ]Professional <br /> Engineer <br /> [ ] Other(Spec) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ )Hydrostatic <br /> [ ]Other(Spec) <br /> Test Equipment Used:Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> SUCTION RETURN VENT <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A.O. Smith A.O.Smith A.O.Smith <br /> Piping Diameter: 5"and 4" 499 and 3 2" and 3" <br /> Length of Piping Run: 85 ft. 85 ft. 85 ft. <br /> Product Stored: Jet-A Jet-A <br /> Method and location of <br /> piping-run isolation: Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:15 am 9:15 am <br /> Initial Readin (Rl) 5 psi 5 psi <br /> Test End Time: 10:15 am 10:15 am <br /> Final Reading(Rf): 5 psi 5 psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(Rf-RI) -0 -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: [X]Pass [ ]Fail [X], Pass [' ]Fail ' [ ] Pass [X] Fail []Pass[]Fail; [ ]Pass [ ]Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.