Laserfiche WebLink
SWRCB.January 2002 Page 7 of 7 <br /> Site: Bank of Stockton <br /> 1941 E.Lockheed Ct <br /> Stockton,CA <br /> Date: June 17,2009 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br /> Test Method Developed By: [ ]Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> [ Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> ALL FILL-TITS Spill Box Spill Box Spill Box <br /> Bucket Diameter: <br /> 12 inch <br /> Bucket Depth: 18-1/2 inch <br /> Wait time between <br /> applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:30 am <br /> Initial Reading(Rl): 18-1/2 inch <br /> Test End Time: 10:30 am <br /> Final Reading(Rf): 18-1/2 inch <br /> Test Duration: 1 hour <br /> Chane in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: [XI Pass Fair Pass I I Fail Pass Fail [ Pass [ ]Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />