My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.January 2002 Page 4 of 7 <br /> Site: Bank of Stockton <br /> 1941 E. Lockheed Ct. <br /> Stockton,CA <br /> Date: June 17,2009 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: [ ] Sump Manufacturer [X] Industry Standard [ )Professional <br /> Engineer <br /> [ ]Other(Spec) <br /> Test Method Used: [ ) Pressure [ ] Vacuum [ ] Hydrostatic <br /> [ ] Other(Sped <br /> Test Equipment Used: CALDWELL LEVEL GAUGE Equipment Resolution: 0.0025 <br /> Sump Diameter: 48 inch 48 inch <br /> Sump Depth: 36 inch 36 inch <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 13 inch 16 inch <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 10 inch 11 inch <br /> Condition of sump prior to testing: Dry Dr <br /> Portion of Sump Tested 1 <br /> Does turbine shut down when sump [X]YES [ ]NO [X]YES [ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> sensor detects liquid(both product& I ]NA [ ] NA [ ]NA [ ]NA <br /> water)? <br /> Turbine shutdown response time: <br /> Is system programmed for fail-safe [ ]YES [ ]NO [] YES[ ]NO []YES[ ]NO [ ]YES[ ]NO <br /> shutdown? [X]NA [X]NA [ INA [ INA <br /> Was fail-safe verified to be [ ]YES[ ]NO [ ]YES[ ]NO []YES[ ]NO [ ]YES[ ]NO <br /> operational? [ INA [ INA [ INA ( ]NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 9:45 am 11:15 am <br /> Initial Reading(Rl): 14 inch 17 inch <br /> Test End Time: 10:15 am 11:45 am <br /> Final Reading 14 inch 17 inch <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading Rf-RI) -0- -0- <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: [X]PASS [ I FAIL [X] PASS [ ]i,FAIL [ ] PASS [ ] FAIL []PASS[ ]NO' <br /> Was sensor removed for testing? [X]YES [ ]NO [X]YES [ ]NO [ ]YES [ ]NO [ ]YES [ ]NO <br /> ]NA NA NA [ NA <br /> Was sensor properly replaced and [X]YES [ ]NO [X]YES [ ]NO [ ]YES [ ]NO [ ]YES[ ]NO <br /> verified functional after testing? 1 ]N/A [ ]N/A [ ]N/A [ INA <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> I If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(*)is "NO"or <br /> "NA",the entire sump must be tested. (SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.