My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:59:23 PM
Creation date
6/3/2020 9:54:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 7 <br />9. METHOD FOR OVERFILL/SPILL PROTECTION AND CLEAN-UP: (continued) <br />2) The small amount of petroleum product remaining in the <br />hose shall be slowly drained into the tank. Since the <br />ball float valve is 2" to 3" below the top of the tank, <br />there remains a 100 + gallon capacity within the tank at <br />the moment when the ball float closes off delivery. <br />The bleed hole in the ball float valve allows the remain- <br />ing petroleum product in the hose to completely drain <br />through the fill pipe into the tank. <br />3) The hose shall be disconnected from the fill pipe only <br />when it has fully drained. In the event that spillage <br />occurs upon hose disconnection, the remaining small <br />amount of petroleum product will be caught in a 20 gallon <br />capacity leakproof spill container (Perkins Welding <br />Works, 14" dia. x 3611). Maximum capacity of a 4" <br />diameter by 20' - 0" long delivery hose is 13 gallons. <br />c. Waste Oil Tank: <br />1) Station is equipped with waste oil buckets which hold a <br />maximum capacity of three (3) gallons (about 3 to 4 cars <br />worth of waste oil). <br />2) Prior to dumping any waste oil, operator is to gauge the <br />tank to assure holding capacity is greater than that <br />which will be put into the tank. <br />v� 3) Waste oil is poured directly through fill/pump out pipe, <br />using a funnel. Should any waste oil spill during this <br />operation, it will be caught in a 5 gallon capacity over- <br />fill container. This container is equipped with a drain <br />r line to dump overfill box contents into fill pipe. <br />` d. Clean-up/Records: <br />1) Small spills (less than 1 gallon and only requiring 15 <br />minutes to clean up) will be cleaned up using absorbent <br />materials. <br />2) Larger spills will be reported to the terminal by the <br />station operator or by delivery truck driver upon return <br />to the terminal. The terminal supervisor will notify a <br />local Petroleum Maintenance Contractor who is equipped <br />with a N.F.P.A. approved type hand pump, vacuum and <br />transport container. <br />
The URL can be used to link to this page
Your browser does not support the video tag.