Laserfiche WebLink
UCSB04N—SS#2611194 Page 7 of 7 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> "TestEquipment Used: INCON TS-STS UNIT Equipment Resolution: <br /> Spill Box#87 F/V Spill Box#91 F/V Spill Box#DSL F/V Spill Box# <br /> eter: 12" 12" 12" 12" 12" 12" <br /> h: 12" 12" 12" 12" 12" 12" <br /> tween applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN <br /> starting test: <br /> Test Start Time: NA NA NA NA NA NA <br /> Initial Reading(RI): NA NA NA NA NA NA <br /> Test End Time: NA NA NA NA NA NA <br /> Final Reading(RF): NA NA NA NA NA NA <br /> Test Duration: NA NA NA NA NA NA <br /> Change in Reading(RF-Ri): NA NA NA NA NA NA <br /> Pass/Fail Threshold or NA NA NA NA NA NA <br /> Criteria: <br /> °Fest Result, p Pass E) Pass ❑ Pass ❑ Pass ❑ Pass F1 Pass ❑ Pass p Pass <br /> ❑Fail (p Fail ❑T aii- ❑Fail ❑Fail ❑Fail ❑Fail ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> FACILITY CONTAINS SPILL BUCKETS BUT WERE NOT TESTED. ALL SPILL BUCKETS WERE <br /> TESTED AT FACILITY'S ONE-YEAR INSPECTION. <br />