My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IF. M-Teaank C'nugiuiiqa3��,/SHR Equ*.aent. U-11—icck this boxif tank gavgzng is uscd only ft)r$r;v{':'stlSry <br /> CrniI c <br /> i7 <br /> U Check this box if no tank gauging or SIR equipment is in tally-ri. <br /> 'Mis section must be completed if in-tank gauging equipment is used to perform lealc detection monitoring. <br /> Complete the following checklist: <br /> U Yes Q No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U Yes U No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> g testing for ground faults? <br /> up? <br /> L3 Yes Q No* Was accuracy of system product level readings tested? <br /> U Yes 0 No* Was accuracy of system water level readings tested? <br /> U Yes U No* Were all probes reinstalled properly? <br /> U Yes all items on the equipment manufacturer's maintenance checklist compl=eted? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (]LLD): Q Check this box if LLDs are not installed. <br /> Complete the foliowin checklist: <br /> U—Yes 0 No* For equipment start-up or annual equipment ce5cation, was a leak simulated to verify LLD performance? <br /> LJ N/A (Check all that apply) Simulated leak rate: ErTg.p.h.; U 0.1 g.p.h; Q 0.2 g.p.h. <br /> U Ye No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes E3 No* Was the testing apparatus properly calibrated? <br /> &Yes o* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Ll N/A <br /> U Yes Ll No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> U N/A <br /> U Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> L3 Yes U No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> L1 N/A or fails a test? <br /> U Yes 0 No* For electronic LLDs,haveP all accessible wiring connections been visually inspected? <br /> U N/A <br /> Q Yes U No* Were all items on the equipment manufacturer's—maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: . ,7-1-7-e -gy- f7--z) 5 <br /> . 7 <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.