My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:51:29 PM
Creation date
6/3/2020 9:54:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JULY 2012-OCTOBER 2013
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_JULY 2012-OCTOBER 2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V 0 <br /> FUEL SYSTEMS CONSULTING <br /> 490 CYPRESS DRIVE, RIO VISTA, CA. 94571 <br /> 925-698-7022 email robert.e gan101 g_mail.com <br /> May 14, 2013 <br /> Scott Owen, Supervisor Building Inspector, City of Tracy Fire Department, tel. 209 8314401 <br /> Re: Fuel Tank Vent Relocation @ Tracy Valero, 2375 N. Tracy Blvd., Tracy, CA 95376 <br /> The Fuel Systems Contractor is Fahy Construction Co. The work involves Relocation of the <br /> existing motor fuel tank vent risers at the rear of the building and relocating them at the north <br /> end of the building and removing the underground vent lines at the rear of the building. The <br /> scope of the work will be: <br /> 1. Install temporary vent risers on each of the existing 3 underground fuel storage <br /> tanks. <br /> 2. Plug each extractor vent to isolate the vent lines from the tank system. <br /> 3. Cold cut with hand tools existing FRP vent lines in trench at new riser location <br /> and cap both ends of each line. <br /> 4. Remove vent lines at rear of building and transport under manifest. <br /> 5. Sample soil where vent lines have been removed in accordance with the permit <br /> and as directed by the COPA. <br /> 6. Install new vent risers and test. <br /> 7. Remove extractor plugs and temporary tank vents. <br /> Thank you for your help in this matter. <br /> Robert S. Eagan <br /> Fuel Systems Consulting, 490 Cypress Drive, Rio Vista, CA 94571, cell 925 698 7022 <br /> 13365L051413.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.