Laserfiche WebLink
revisions by <br /> SOIL SAMPLES TO BE TAKEN AT 20 05/06/13 RSE <br /> INTERVALS AS PER FERMI <br /> REQUIREMENTS <br /> --------------------------------- DISPOSAL OF PIPING SHALL BE PROVIDED BY ECI(ECOLOGY CONTROL) <br /> INCLUDING TRANSPORTATION <br /> REMOVE(4)2"FRP"UST'VENT LINES INCLUDING III I I I 0 <br /> BACK TO THE NEW VENT RISER LOCATION AS SHOWN. III (1I <br /> 1111 1111 <br /> III A" 1111 > <br /> INSTALL NEW VENT SUPPORT PER MFG.INSTALLATION W <br /> INSTRUCTIONS. <br /> ENT RISERS TO BE 2"SCHEDULE 40 GAL.STEEL PIPE WITH 0 <br /> APPROVED CAPS. p <br /> LL <br /> (E)VEEDER-ROOT TLS-350 MONITOR PANEL MIN.12'A.G. J <br /> UPGRADE FOR EVR/IS DISTANCE FROM BUILDING ADJUST TO SITE CONDITIONS. W O m M <br /> I— of <br /> INSTALL VEEDER-ROOT CANISTER U <br /> roof ridge line model no.861290-002 per mfg. >Z} <br /> installation instructions,in accordance <br /> with CSFM and CARB certifications, "' <br /> r` <br /> on the 87 gas tank vent riser. N <br /> CASHIER 0 <br /> (E)CONCRETE CUR 0 � <br /> w o <br /> (E)UNDERGROUND TANKS z <br /> 1-12,000 GALLON 87 GASOLINE IJ I <br /> nearest to buildingy <br /> 1-10,000 GALLON 89 GASOLINE W < o <br /> 1-10,000 GALLON 91 GASOLINE W y v`3 <br /> > > M <br /> W <br /> W <br /> (E)EMERGENCY PUMP SHUT OFF <br /> 0 LU <br /> DO Q It o <br /> ^ N <br /> N ^ W <br /> 0 CL <br /> a <br /> 0 m E <br /> O 00 O W E <br /> Z � Z � <br /> UPGRADE(4)(E)MPD'S <br /> Z W U) m <br /> GILBARCO model no.B85 IX p OV <br /> 00 0 Q g <br /> (single hose non blender) O rn <br /> install flow meter in each 0 O j <br /> w 3 <br /> dispenser,install a pressure > H <br /> sensor in the unit nearest the } <br /> 87 tank,install the proper hanging rn <br /> hardware.typical of 4 m w m <br /> UJ <br /> L <br /> 12/21/2012 <br /> R.S.EAGAN <br /> roe o. <br /> 12-354 <br /> area. <br /> 12354F2.3 <br /> 2375 N. TRACY BLVD. REMOVE TANK VENT PIPING) F_2 <br /> — <br />