My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:51:29 PM
Creation date
6/3/2020 9:54:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JULY 2012-OCTOBER 2013
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_JULY 2012-OCTOBER 2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond von Flue [EH] <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />Tracking: <br />Sunita, <br />Raymond von Flue [EH] <br />Tuesday, March 19, 2013 3:59 PM <br />'skapoorlaw@gmail.com' <br />'Robert Huff (robert.huff@ci.tracy.ca.us)'; Kasey Foley [EH]; Willy Ng [EH]; Thuy Tran [EH]; <br />'JDutt@savemart.com'; 'atull@savemart.com' <br />ABC Petroleum Inc., 2375 N Tracy Blvd., Tracy CA <br />Recipient <br />'skapoorlaw@gmail.com' <br />'Robert Huff (robert.huff@ci.tracy.ca.us)' <br />Kasey Foley [EH] <br />Willy Ng [EH] <br />Thuy Tran [EH] <br />'JDutt@savemart.com' <br />'atull@savemart.com' <br />Delivery <br />Delivered: 3/19/2013 3:59 PM <br />Delivered: 3/19/2013 3:59 PM <br />Delivered: 3/19/2013 3:59 PM <br />I spoke with Robert Huff with the City of Tracy Building Department today. He informed me that the first submittal of <br />plans were received in Sept/Oct 2012. He wrote a deficiency letter for several items. During his review it was brought <br />to our department's attention that the remodel of the store would cover/impact the footprint of the waste oil <br />underground storage tank (UST) located to the west of the store. Mr. Huff stated that he just received the revised plans <br />yesterday that show a change for the store to be built around the waste oil UST. He also informed me that he is trying <br />to get the revised plan approved in the next ten business days. <br />As for our department, we are concerned about the proximity of the store to the tank pad. Construction on the <br />foundation could damage the waste oil UST. What will be the distance that the store will be built around the tank? <br />Another concern that needs to be addressed is the fact that the remodel of the store will not include an auto repair <br />business at this facility anymore. If the waste oil UST will continue to be used for storing waste oil, where will the waste <br />oil be generated from? Compliance with Hazardous Waste regulations/statutes must be achieved when the UST is <br />approved to operate. If the waste oil UST is found not to be in use, a permit application for closure must be submitted <br />to our department. <br />We have approved the permit application that was submitted to our department for upgrading the UST system for <br />Enhanced Vapor Recovery (EVR). According to Mr. Huff, the EVR upgrade is part of the Building Permit <br />application. Since he just received the plans yesterday, work cannot proceed until he approves the plans. Another <br />concern with the EVR upgrade and the store expansion is the fact that the vent piping that come from all of the UST's <br />are located along the west side of the building adjacent to the waste oil UST. If the vent piping needs to be relocated <br />because of the building expansion, an amendment to the approved permit application must submitted as well as a plan <br />of the new location for the vent piping. <br />Several other issues need to be resolved as outlined in the UST Official Inspection Report from July 5, 2012 that was <br />issued to and received by ABC Petroleum Inc., in the Notice to Abate from Nov. 1, 2012 that was issued and received by <br />ABC Petroleum Inc., and again in the UST follow up letter from Nov. 6, 2012 that was issued to and received by ABC <br />Petroleum Inc.: <br />1. Annual Monitoring System Certification —The last certification was performed on June 30, 2008. This <br />certification is required before the UST system can be approved to operate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.