My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_JULY 2012-OCTOBER 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:51:29 PM
Creation date
6/3/2020 9:54:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JULY 2012-OCTOBER 2013
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_JULY 2012-OCTOBER 2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fahm Construction • 1 • <br />GENERAL ENGINEERING+ r, <br />. 477315 <br />411 North94553 <br />Phone: 925-674-8800 FAX: 925-674-8801 <br />DATE December 05, 2012 <br />TO-Hakam Mission Mission Petroleum Distributors 2952 Collier Canyon Road <br />Livermore, CA 94551: EVR & ISD upgrade work: 2375 N. Tracy Blvd Tracy <br />We propose to furnish labor and materials as follows: <br />1. Install new flow meters in each of four existing dispensers and <br />connect to existing vapor line under each dispenser. <br />2. Provide and install additional conductor in existing conduit to <br />each dispenser for hook up of new flow meters to the existing <br />monitor panel. <br />3. Mount new hoses, breakaways, and nozzles on existing dispensers, <br />and provide purging of lines after start up. <br />4. Mount Veeder.Root canister and vapor pressure sensor on existing <br />vent rack and plumb to existing vents. <br />5. Provide and install conduit and wire to canister and pressure <br />sensor from existing monitor panel. <br />6. Provide application to County Health and Air Quality District for <br />permit, with permit fees provided by owner. <br />** All petroleum equipment, start up, testing, programming, and <br />calibration to be provided by others. <br />** Existing conduit and underground plumbing to be utilized for <br />new flow meters and wiring to monitor panel. <br />(Continued on the following page) <br />
The URL can be used to link to this page
Your browser does not support the video tag.