Laserfiche WebLink
L] <br />Mission Petroleum (con nued) <br />** Does not include any repair to existing dispensers. This proposal assumes <br />that existing dispensers are operable. <br />** Site re -certification for operating permit to be provided by others. <br />Exclusions: <br />Unless indicated above, the following exclusions apply to this proposal: <br />Permits: Permits and permit fees are not included. When permit application is included, application to be made to Fire, <br />County Health (if required) and Air Quality District. Application to City Building Department (if required) to be <br />provided on a time and material basis as additional work. <br />Petroleum equipment All petroleum equipment, start up, re -certification of monitor system, and air quality testing to <br />be provided by others. <br />Construction: Existing conduit to be utilized for new wiring. In the event conduits are not available or unusable, <br />additional charges will result. <br />Healy tank installations: Does not include furnishing or installation of enclosures. <br />Payment: Twenty percent down, with forty percent on the day work begins, and balance upon mounting of hoses and <br />nozzles. <br />This proposal is subject to conditions found on both pages of this agreement. <br />Our price is: <br />Sixteen thousand six hundred twenty and NO/100's dollars($ 16,620.00 ) <br />Payment(s) to be made as follows: . <br />Twenty percent down for application of permits, with forty percent on the <br />day work begins, and the balance upon mounting of new hoses and nozzles. <br />ACCEPTED: The above prices, specifications and Respectfully Submitted, <br />conditions are satisfactory and are hereby accepted. Fahy Construction Company, Inc. <br />You are authorized to do the work as specified. ,, <br />Payment will be made as outlined above. <br />Date of Acceptance <br />By. <br />Titl <br />By <br />John F. Fahy <br />Note: This proposal may be withdrawn by us if <br />not accepted within 30 days. <br />Work will begin within 45 working days <br />of acceptance subject to materials availability. <br />