My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'101/25/05 15:41 FAX 925 422 2748 EPD / WGMG 191003 <br /> SWRCB,January 2002 FINAL DRAFT Page 2 of '17� 4 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: Z Tank Manufacturer IZ Industry Standard EI.Professional Engineer <br /> E]Other(Specify) <br /> Test Method Used: E]Pressure 0 vacuum E]Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: 0 to 30"hg Dial Gauge Equipment Resolution: 2%@ Mid <br /> 77, 77777 7 <br /> Tank# <br /> DIESEL <br /> Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?' Ely-s No ElYes ONo [—]Yes FNo ElYes E]No <br /> Tank Capacity: 1500g <br /> Tank Material: Steel/Fiberglass <br /> Tank Manufacturer: Modem Welding <br /> Product Stored: Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:05am <br /> Initial Reading(Rj): tO.00"hg <br /> Test End Time: IO.OSarn <br /> Final Reading(.Rr): 10.00"hg <br /> Test Duration: 60 minutes <br /> Change in Reading(RF-RI): 0.00"hg <br /> Pass/Fail Threshold or Criteria: 0.00"hg <br /> Tea Result ZPass [DFail, ElPass OFail 00ass ElFail ElPass []Fait <br /> Was sensor removed for testing? E]Yes No E]NA EjYes E]No[INA OYes F1No[]NA E]Yes nNo ONA <br /> Was sensor properly replaced and ElYes[]NO[gNA []Yes ONo[INA E]Yes E]No EINA E]Yes E]No FINA <br /> verified functional after testing? — I -- <br /> Comments—(include information on repairs made prior to testing,and recommended follow-Hp for failed tests.) <br /> Six month follow up testing after constructiori. <br /> This is an Emergency Generator Tank,there are no dispensers or fill sumps and the spill bucket was tested during the Annual <br /> Monitor Certification. <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (California Code of Regulations,Title 23,Section 2637(4)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.