Laserfiche WebLink
x01/25/05 15:41 FAX 925 422 2748 EPD / WGMG ff71004 <br /> SWRCB,January 2002 FINAL DRAFT Page 3 of�9, 4 <br /> i <br /> SECONDARY PIPE TESTING <br /> Test Method Developed'By: �]Piping Mgm.if�cturer ®,Industry Standard ®Professional Engineer <br /> r]Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: 0 to I5psi Dial Gauge Equipment Resolution: <br /> 2%@ Mid Scale <br /> Piping Ran# ,Piping Run# . Piping.Run# .Piping Run# , <br /> r' Common FOS/FOR <br /> Piping Material: FRP <br /> Piping Manufacturer: Fte�reron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method.and location of Boot @ Sump. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 minutes <br /> starting test: <br /> Test Start Time: 8:451 <br /> Initial Reading(Ra): 5.00 psi <br /> Test End Time: 4:45am <br /> Final Reading(RF): 5:00 psi <br /> Test Duration: 60 minutes <br /> Change in Reading(.RF-R{): 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi <br /> Criteria: <br /> Test Result ®Pass ®Bail ❑Paso []Feil []Pass ❑Fail ®Pass ®Bail <br /> Comments—(Include information on repairs made prior to testing, and recommended fallow-up for failed tests.) <br /> Six month follow up testing after construction. <br /> i <br />