My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x01/25/05 15:41 FAX 925 422 2748 EPD / WGMG ff71004 <br /> SWRCB,January 2002 FINAL DRAFT Page 3 of�9, 4 <br /> i <br /> SECONDARY PIPE TESTING <br /> Test Method Developed'By: �]Piping Mgm.if�cturer ®,Industry Standard ®Professional Engineer <br /> r]Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: 0 to I5psi Dial Gauge Equipment Resolution: <br /> 2%@ Mid Scale <br /> Piping Ran# ,Piping Run# . Piping.Run# .Piping Run# , <br /> r' Common FOS/FOR <br /> Piping Material: FRP <br /> Piping Manufacturer: Fte�reron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method.and location of Boot @ Sump. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 minutes <br /> starting test: <br /> Test Start Time: 8:451 <br /> Initial Reading(Ra): 5.00 psi <br /> Test End Time: 4:45am <br /> Final Reading(RF): 5:00 psi <br /> Test Duration: 60 minutes <br /> Change in Reading(.RF-R{): 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi <br /> Criteria: <br /> Test Result ®Pass ®Bail ❑Paso []Feil []Pass ❑Fail ®Pass ®Bail <br /> Comments—(Include information on repairs made prior to testing, and recommended fallow-up for failed tests.) <br /> Six month follow up testing after construction. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.