My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/28/05 16:13 FAX 925 422 2 48 <br />SWRCB, January 2002 <br />Q VX1d_%1WTn ADV _PMV 9pw QlrTTCr- <br />EPD / WGMG 0 <br />FINAL DRAFT <br />N <br />Page _I of —"% 4 <br />Test Method Developed By: [I Piping Manufacturer ®.Industry Standard El Professional Engineer <br />[I Other (Specify) <br />I <br />Test Method Used: Pressure n Vacuum El Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 0 to 15psi Dial Gauge <br />Equipment Resolution: 2% (a-), Mid Scale <br />Piping Material: <br />iiiH <br />Pip 'ing Run # <br />Common FOS/FOR <br />FRP <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Manufacturer: <br />Ameron <br />Piping Diameter: <br />4" <br />Length of Piping Run: <br />12' <br />Product Stored: <br />Diesel <br />Method. and location of <br />piping -run isolation: <br />Boot @ Sump. <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test - <br />5 minutes <br />Test Start Time: <br />8:45am <br />Initial Reading K): <br />5.00 psi <br />Test End Time: <br />9:45am <br />Final Reading (RF): <br />5.00 psi <br />Test Duration: <br />60.minutes <br />Change in Reading (RF -R '. <br />- <br />0.00 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 psi <br />Test Result <br />®Pass E]Fail <br />[:]Pass []Fail <br />:]Fail <br />OPass E]FaU <br />-Comments — (Include information on repairs made prior to testing, and recommended follow-up for, failed tests) <br />Six month follow Up testa Tig <br />
The URL can be used to link to this page
Your browser does not support the video tag.