My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,01/28/05 16:14 FAX 925 422 2748 <br />SWRCB, January 2002 <br />FPD WGMG <br />a006 <br />Page 4 of '7, 4 <br />Test Method Developed By: El sump Manufacturer Industry Standard Professional Engineer <br />D Other (Specify) <br />Test Method Used: El Pressure ❑ Vacuum Hydrostatic <br />D Other (Specify) <br />Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br />777 <br />Sump 9 Sump Sump 4 Sump <br />DIESEL <br />Diameter: <br />36.0" <br />-Sump <br />Slump Depth from Top of Tank: <br />36.0" <br />Sump Material: <br />FRP <br />Height from Tank Top to Top of <br />Piping Penetration: <br />17.75" <br />-Highest <br />Height from Tank Top to Top of <br />Lowest Electrical Penetration: <br />Condition of sump prior io <br />Depth of Sump Tested' <br />19.75" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />E)Yes No [DNA <br />OYes DNo, [DNA <br />DYes ONo DNA <br />DYes DNo DNA <br />Turbine shutdown response time: <br />NA <br />Is system programmed for fail-safe <br />shutdown?* <br />ElYes ®No MNA <br />DYes E]No DNA <br />DYes ONo [INA <br />DYes ONo [:INA <br />Was fail-safe verified to be <br />operational?* <br />®Yes [:]No ®NA <br />DYes DNo DNA <br />E]Yes ®No [INA <br />DYes 7No DNA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />1 10 minutes <br />Test Start Time: <br />9:00am. <br />Initial Reading (Ri)-. <br />19.75" <br />Test End Time: <br />9-45am <br />Final Reading (Rp.); <br />19.75" <br />Test Duration: <br />45 minutes <br />Change in Reading (R,, -R,): <br />0.00" <br />Pass/Fail Threshold or Criteria: <br />0.001, <br />Test Result <br />77• <br />L <br />DFail <br />ElPass ®Fail <br />Was sensor removed for testing? <br />®Yes E]No DNA <br />DYes DNo DNA <br />DYes DNo DNA <br />_] Yes DNo []NA <br />F <br />Was sensor properly replaced and <br />verified functional after testing? <br />L[pyes ®No [INA <br />®Yes nNo [INA <br />DYes ONo DNAOYes <br />DNo DNA <br />t - <br />Comments --- (include information failed tests.) <br />Six month follow up testing after construction. <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO", then the entire sump should be tested. (See SWRC13 LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.