My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />SWRCB, January 2002 FINAL DRAFT Page 2 ofiC 4 <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: Tank Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ® Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 0 to 30" hg Dial Gauge Equipment Resolution: 2%@ Mid <br />` <br />Tank # <br />DIESEL <br />Tank # <br />Tank # <br />Tank # <br />Is Tank Exempt From Testing?' <br />❑Yes ®No <br />❑Yes ❑No <br />❑Yes [:]No <br />❑Yes ❑No <br />Tank Capacity: <br />1500g <br />Tank Material: <br />Steel/Fiberglass <br />Tank Manufacturer: <br />Modern Welding <br />Product Stored: <br />Diesel <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />Test Start Time: <br />9:05am <br />Initial Reading (Rj): <br />10.00" hg <br />Test End Time: <br />10:05am <br />Final Reading (RF): <br />10.00" hg <br />Test Duration: <br />60 minutes <br />Change in Reading (RF -R{): <br />0.00" hg <br />Pass/Fail Threshold or Criteria: <br />0.00" hg <br />Test Result <br />®Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />Was sensor removed for testing? <br />❑Yes ®No [INA <br />[]Yes ❑No ❑NA <br />❑Yes []No ❑NA <br />❑Yes [-]No [:]NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />[]Yes❑ No® NA <br />❑Yes❑No ❑NA <br />❑Yes [:]No [-]NA <br />❑Yes No EINA <br />Comments — (Include information on repairs made prior to testing, and recommended follow-up for failed tests.) <br />Six month follow up testing after construction. <br />This is an Emergency Generator Tank, there are no dispensers or fill sumps and the spill bucket was tested during the Annual <br />Monitor Certification. <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.