Laserfiche WebLink
0 <br />SWRCB, January 2002 <br />SECONDARY PIPE TESTING <br />FINAL DRAFT Page 3 of <br />Test Method Developed By: El Piping Manufacturer Industry Standard El Professional Engineer <br />[I Other (Specify) <br />Test Method Used: 0 Pressure [I Vacuum El Hydrostatic <br />E] Other (Specify) <br />Test Equipment Used: 0 to 15psi Dial Gauge Equipment Resolution: <br />2%- Mid Scale <br />Piping Run # <br />Piping Run # Piping Run # <br />Piping Ron # <br />Common FOS/FOR <br />Piping Material: FRP <br />Piping Manufacturer: Ameron <br />Piping Diameter: 4" <br />Length of Piping Run: 12' <br />Product Stored: Diesel <br />Method and location of Boot @ Sump. <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and 5 minutes <br />starting test: <br />Test Start Time: 8:45am <br />Initial Reading 5.00 psi <br />Test End Time: 9:45am <br />Final Reading (RF): 5.00 psi <br />Test Duration: 60 minutes <br />Change in Reading (RF -N: 0.00 psi <br />Pass/Fail Threshold or 0.00 psi <br />Criteria: <br />Test Result ZPass OFail <br />[]Pass ElFail []Pass [:]Fail <br />[]Pass []Fail <br />Comments — (Include information on repairs made prior to testing, and recommended follow-up forfiailed tests) <br />Six month follow up testing after construction. <br />I <br />