Laserfiche WebLink
SWRCB, January 2002 <br />FINAL DRAFT <br />5. MING SUMIP TESTING <br />I <br />Page 4 of '7, 4 <br />Test Method Developed By: r_1 Sump Manufacturer Industry Standard El Professional Engineer <br />E] Other (Specify) <br />Test Method Used: n Pressure F-1 Vacuum Hydrostatic <br />E] Other (Specify) <br />Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br />Sump # Sump # Sump # Sump # <br />DIESEL <br />Sump Diameter: 36.0" <br />Sump Depth from Top of Tank: <br />36.0" <br />Sump Material: <br />FRP <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />17.75" <br />Height from Tank Top to Top of <br />Lowest Electrical Penetration: <br />15.5" <br />Condition of sump prior to testing: <br />Clean/Dry <br />Depth of Sump Tested' <br />19.75" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />nYes [-]No-INA <br />ERNA <br />ElYes MNo EINA <br />E]Yes E]No EINA <br />E]Yes nNo F <br />Turbine shutdown response time: <br />NA <br />Is system programmed for fail-safe <br />shutdown?* <br />nYes nNo ®NA <br />MYes E]No nNA <br />E]Yes EjNo [_]NA <br />nYes []No RNA <br />Was fail-safe verified to be <br />operational?' <br />MYes E]No ®NA <br />nYes E]No EINA <br />[]Yes E]No nNA <br />[-]Yes E]No EINA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />10 minutes <br />Test Start Time: <br />9:00am <br />Initial Reading (Rj): <br />19.75" <br />Test End Time: <br />9:45arn <br />Final Reading (RF): <br />19.75" <br />Test Duration: <br />45 minutes <br />Change in Reading (RF -RI): <br />0.00" <br />Pass/Fail Threshold or Criteria: <br />0.001, <br />Test Result <br />SPass [:]Fail <br />OPass OFail <br />E]Pass []Fail <br />Elpass [:]Fail <br />Was sensor removed for testing? <br />®Yes [:]No [:INA <br />E]Yes [-]No [INA <br />E]Yes E]No EINA <br />MYes FINo EINA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®g es E]No DNA <br />[]Yes [:]No EINA <br />FjYes nNo [:INA <br />nYes FjNo nNA <br />Comments - (include information on repairs made prior to testing, and recommended follow -tip for failed tests.) <br />Six month follow up testing after construction. <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NU', then the entire sump should be tested. (See SWRCB LG -160) <br />