My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 4:38:41 PM
Creation date
6/3/2020 9:55:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 3
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCRL-AR-103194 <br /> standby emergency generator to Bldg 882,occupied by LLNL's Protective <br /> Services Division. <br /> The steel tank with fiberglass-clad exterior,made by Modern Welding, <br /> has a 1500-gallon capacity. The tank is double-walled,consisting of a <br /> smaller,primary tank that contains the product(in this case,diesel fuel) <br /> nested inside a larger,encasing secondary tank. The space enclosed between <br /> the two tank walls is the tank's annular space. <br /> The piping is also considered a part of the tank system. Like the tank, <br /> the piping is double-walled, the primary piping being surrounded by <br /> secondary piping. The secondary piping is connected to a piping containment <br /> sump. <br /> Monitoring Procedure <br /> The monitoring procedure is a continuous electronic monitoring <br /> procedure. The electronic monitoring equipment is tested and maintained <br /> through weekly and annual checks. <br /> Electronic Monitoring of Tank System <br /> The tank is electronically monitored at all times with a Universal Leak <br /> Alert Hazardous-Substance Sensor(Alarm Panel Model LA-02,Liquid Probe <br /> Model LALS-1). The liquid probe is installed in the tank's annular space and <br /> connected with electrical conduit to the sensor's audio-visual alarm panel. If <br /> there is a leak in the primary tank wall,the product will drain into the <br /> secondary tank. When the product covers the sensor's liquid-sensitive probe, <br /> the alarm will activate. The alarm panel for the liquid probe is mounted on the <br /> west wall of Bldg 882 (Fig. 1). <br /> The tank's piping also is electronically monitored at all times,in this case <br /> with a Universal Leak Alert Hazardous-Substance Sensor(Alarm Panel <br /> Model LA-02,Liquid Probe Model LALS-1). The liquid sensor is placed in <br /> the piping-containment sump above the tank and connected with electrical <br /> conduit to the sensor's audio-visual alarm panel. If there is a leak in the <br /> primary piping wall, the product will drain into the secondary piping. From <br /> the secondary piping, the product will drain into a piping-containment sump. <br /> When the product covers the sensor's liquid-sensitive probe in the sump,the <br /> alarm will activate. The alarm panel for the liquid sensor is mounted on the <br /> west wall of Bldg 882 (Fig. 1). <br /> If the Operator has any questions or concerns about the monitoring <br /> probe,he can contact the manufacturer,Universal Sensors and Devices, Inc., <br /> at(800)-899-7121 or Leak Alert Service Co., at(800)-464-4405. <br /> Equipment Maintenance <br /> In response to a request by San Joaquin County Public Health Services, <br /> the following electronic monitoring equipment is checked each week: <br /> • Green power light. <br /> • Red tank alarm light. <br /> 2 Monitoring Program for New Underground Storage Tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.