Laserfiche WebLink
CLOSURE REPORT FOR UNDERGROUND STORAGE TANK 827-D2U1 <br /> Any piping closed in place: [ X ]Yes [ ]No <br /> Describe where the piping was closed in place,and how it was closed(e.g.grouted and capped): <br /> Fuel contents drained into the tank then the pining at the edge of the concrete slab was cut <br /> and capped The pining section from the emergencygenerator to where it went into the <br /> concrete pad was also cut and capped Approximately 6-feet of underground piping (fuel <br /> supply and return,piling)was left in place under the concrete slab <br /> Underground concrete tank anchoring structure(s)were present: [ ]Yes [ X ]No <br /> Size and location of the concrete tank anchoring structure(s): N/A <br /> Description of tank and piping condition (corrosion,pitting, holes, etc.): The tank was in good <br /> condition with some external tank corrosion Photographs of the tank were taken by Marion <br /> Heaton(6/22/94) <br /> The tank and piping were transported by: Erickson.Inc. <br /> The tank and piping were disposed of as: Nan-RCRA Hazardous Waste. Solid (Empty <br /> Containers Last Containing Diesel Fuel with associated pining) Date: 6/22/94 <br /> Name and address of disposal facility: Erickson Inc. (Hauler Registration No. 0019), <br /> 255 Parr Blvd Richmond CA 94801 (510)235-1393 <br /> [ X ] Uniform Hazardous Waste Manifest"TSD Facility to Generator' and LLNL Hazardous <br /> Waste Disposal Requisition copies for UST 827-D2U1 are enclosed as Appendix C. <br /> [N/A] UST Disposition Tracking Record enclosed (San Joaquin County Only). <br /> STC Tank#39-1945-08. <br /> EXCAVATION INFORMATION: <br /> Soil was excavated by: PetroTek. Date: 622 4 <br /> Shoring was required: [ ] Yes [ X ] No <br /> Type of shoring used: N/A. <br /> Soil types encountered within the tank excavation: <br /> 0-11 ft. Silty clay with siltygravel lenses several inches thick <br /> Describe any potential contaminant pathways such as tree roots or underground utility lines <br /> discovered in the excavation: None. <br /> Describe any odors or staining found in the fill material or native soil: None. <br /> Soil Disposal Information: <br /> [ ] Not Applicable. (Soil and backfill placed back into the tank excavation and piping trench). <br /> The volume of disposed soil: N/A cubic yards. <br /> The soil was transported by: N/A <br /> The soil was disposed of as: N/A Date: N/A <br /> The concrete tank anchoring structure(s)was disposed of with the soil: <br /> [ ]Yes [ ]No [ ]Left in the Tank Excavation [ X ]N/A <br /> If no,describe how the concrete tank anchoring structure(s)was disposed of: N/A <br /> Name and address of disposal facility: N/A <br /> Additional native soil removed as part of a remedial effort: [ ]Yes [ X ]No <br /> [N/A] Uniform Hazardous Waste Manifest"TSD Facility to Generator"and LLNL Hazardous <br /> Waste Requisition copies for the soil enclosed. <br /> Volume of native soil removed: 2* cubic yards. <br /> Volume of backfill removed: 8*cubic yards. *(10 cu.yds.comprised of both soil and fill gravel) <br /> Describe how the excavated soil was handled (i.e. how and where it was stored): The soil was <br /> stockpiled on and covered with visaueen and stored in the B827A area at Site 300 The soil <br /> has not been disposed of yet Disposal methods have not yet been determined Disposal will <br /> occur when the sample analyses and review prcess has been completed <br /> Soil or backfill returned to the tank excavation or piping trench: [ ]Yes [ X ]No <br /> If yes,volume of soil returned to the excavation: N/A cubic yards <br /> Reason for the return of the soil to the tank excavation or piping trench: N/A. <br /> 2 <br />