My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 8
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:53:26 PM
Creation date
6/3/2020 9:55:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 8
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> BACKGROUND:......................................................................................................................................1 <br /> TANK/PIPING INFORMATION:.........................................................................................................1 <br /> EXCAVATIONINFORMATION: .........................................................................................................2 <br /> ENVIRONMENTAL SAMPLE INFORMATION:...............................................................................3 <br /> SOIL....................................................................................................................................................3 <br /> WATER...............................................................................................................................................3 <br /> SUMMARY OF ENVIRONMENTAL SAMPLES COLLECTED:......................................................4 <br /> SUMMARY OF LABORATORY ANALYTICAL RESULTS:.............................................................4 <br /> PERSONAL PROTECTION EQUIPMENT(PPE)DISPOSAL: .........................................................5 <br /> CLOSURE REPORT CONCLUSIONS: .................................................................................................5 <br /> OTHER OBSERVATIONS: .....................................................................................................................5 <br /> APPENDIX A: COPY OF THE 805-DlU1 APPROVED CLOSURE PLAN <br /> SIGNED APPLICATION FOR UNDERGROUND TANK CLOSURE <br /> PERMIT.........................................................................................................................A-1 <br /> APPENDIX B: UNIFORM HAZARDOUS WASTE MANIFEST and LLNL <br /> HAZARDOUS WASTE DISPOSAL REQUISITION FOR TANK <br /> CONTENTS..................................................................................................................B-1 <br /> APPENDIX C: UNIFORM HAZARDOUS WASTE MANIFEST and LLNL <br /> HAZARDOUS WASTE DISPOSAL REQUISITION FOR <br /> UST 805-DlUl AND ASSOCIATED PIPING .........................................................0-1 <br /> APPENDIX D: FIGURES&PHOTOGRAPHS OF THE TANK CLOSURE ACTIVITIES...........D-1 <br /> FIGURE 1: Sample locations for the closure of UST 805-DlUl..................................................................D-2 <br /> PHOTOGRAPH 1: View of the excavation pit for UST 805-DlUl............................................................D-3 <br /> PHOTOGRAPH 2: View of the backhoe lifting UST 805-DlUl out of the excavation...........................D-4 <br /> PHOTOGRAPH 3: View of Marion Heaton collecting soil sample that has been collected by <br /> the backhoe bucket from the UST 805-DlUl excavation.....................................................D-5 <br /> PHOTOGRAPH 4: View of UST 805-DlUl excavation soil stockpile on visqueen surface..................D-6 <br /> PHOTOGRAPH 5: View of Dave Castro collecting soil sample from the UST 805-DlUl <br /> excavationstockpile...................................................................................................................D-7 <br /> PHOTOGRAPH 6: View of UST 805-DlUl being mounted onto Erickson truck. Hold-down <br /> strapsare in place.......................................................................................................................D-8 <br /> PHOTOGRAPH 7: Photograph of 250-gallon diesel replacement tank system mounted on a <br /> concretepad................................................................................................................................D-9 <br /> APPENDIX E: ANALYTICAL DATA&CHAIN OF CUSTODY RECORDS...............................E-1 <br /> APPENDIX F: COPY OF THE UNDERGROUND STORAGE TANK UNAUTHORIZED <br /> RELEASE(LEAK)/CONTAMINATION SITE REPORT,TANK <br /> 805-DlUl AT BUILDING 805 ...................................................................................F-1 <br /> APPENDIX G: CONSOLIDATED ENGINEERING LABS FIELD DENSITY REPORT...............G-1 <br /> APPENDIX H: CERTIFICATE OF TANK DESTRUCTION,ERICKSON,INC............................H-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.