Laserfiche WebLink
TABLE OF CONTENTS <br /> CLOSURE REPORT <br /> BACKGROUND: .. <br /> TANK/PIPING INFORMATION:.......................................................................................................1 <br /> EXCAVATION INFORMATION: .......................................................................................................2 <br /> ENVIRONMENTAL SAMPLE INFORMATION:.............................................................................3 <br /> SOIL....................................................................................................................................................3 <br /> WATER...............................................................................................................................................3 <br /> SUMMARY OF ENVIRONMENTAL SAMPLES COLLECTED:....................................................4 <br /> SUMMARY OF LABORATORY ANALYTICAL RESULTS:...........................................................4 <br /> PERSONAL PROTECTION EQUIPMENT(PPE)DISPOSAL: .......................................................5 <br /> CLOSUREREPORT CONCLUSIONS: ...............................................................................................6 <br /> CORRECTIVE ACTION REPORT............................................................................7 <br /> HYDROGEOLOGY OF THE BUILDING 871 AREA........................................................................8 <br /> APPENDICES <br /> APPENDIX A: COPY OF THE 871-DlU1 APPROVED CLOSURE PLAN <br /> SIGNED APPLICATION FOR UNDERGROUND TANK CLOSURE <br /> PERMIT.........................................................................................................................A-1 <br /> APPENDIX B: DOCUMENTS FOR DISPOSITION OF THE DIESEL FUEL CONTAINED <br /> BY THE TANK: HAZARDOUS WASTE DISPOSAL REQUISITION <br /> AND SHIPPING DOCUMENTS,EVERGREEN ENVIRONMENTAL <br /> SERVICES BILL OF LADING,AND THE LLNL UNIFORM <br /> HAZARDOUS WASTE MANIFEST FOR TANK CONTENTS............................B-1 <br /> APPENDIX C: UNIFORM HAZARDOUS WASTE MANIFEST FOR DISPOSITION OF <br /> THE UNDERGROUND TANK 871-DlUl AND ASSOCIATED PIPING, <br /> AND CERTIFICATE OF TANK DESTRUCTION..................................................C-1 <br /> APPENDIX D: FIGURES&PHOTOGRAPHS OF THE TANK CLOSURE ACTIVITIES...........D-1 <br /> FIGURE 1: July 26,1994,siltstone sampling locations for the closure of UST <br /> 871-DlU1......................................................................................................................D-2 <br /> PHOTOGRAPH 1: Underground tank 871-DlUl being removed from the ground on <br /> July26,1994..................................................................................................................D-3 <br />