My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 9
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 2:14:03 PM
Creation date
6/3/2020 9:56:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 9
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 9.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHOTOGRAPH 2: Bill Snavely of San Joaquin County and Marion Heaton of LLNL <br /> attempting to drive a sampling container into siltstone at the bottom of <br /> the 871-DlU1 excavation on July 26,1994. When it was determined that <br /> the siltstone was too hard,samples were collected from the backhoe <br /> bucket. ..........................................................................................................................D-4 <br /> PHOTOGRAPH 3: Patti Kluck and Marion Heaton of LLNL collecting a soil sample <br /> from the 871-DlU1 underground piping trench on July 26,1994........................D-5 <br /> PHOTOGRAPH 4: A jackhammer attached to the excavator breaks up the siltstone in <br /> the 871-DlU1 excavation on August 23,1994.........................................................D-6 <br /> PHOTOGRAPH 5: Diane Hinson of San Joaquin County and Charlie Brown of LLNL <br /> examine soil(siltstone)excavated at the bottom of the 871-DlU1 <br /> excavation on August 25,1994..................................................................................D-7 <br /> PHOTOGRAPH 6: The 871-DlUl excavation being filled with clean pea gravel in <br /> anticipation of installation of a double-wall underground tank 871- <br /> D1U2..............................................................................................................................D-8 <br /> APPENDIX E: ANALYTICAL DATA&CHAIN OF CUSTODY RECORDS...............................E-1 <br /> APPENDIX F: FIELD DENSITY(SOIL COMPACTION)REPORT...............................................F-1 <br /> APPENDIX G: COPY OF THE UNDERGROUND STORAGE TANK UNAUTHORIZED <br /> RELEASE(LEAK)/CONTAMINATION SITE REPORT,TANK <br /> 871-DlUl AT BUILDING 871.....................................................................................G-1 <br /> APPENDIX H: SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES LETTER TO LLNL <br /> "LLNL-SITE 300,UST REMOVALS-BLDGS#834 AND 871",AUGUST 4, <br /> 1994.................................................................................................................................H-1 <br /> APPENDIX I: LLNL LETTER TO SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br /> 'BUILDING 871 UNDERGROUND STORAGE TANK 871-DlU1 PROPOSAL <br /> FOR CORRECTIVE ACTION',AUGUST 3,1994....................................................I-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.