My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CNI Manufacturing Installation, Operation and Maintenance Manual (IOM) <br />Applicable to Executive Order VR -104-D <br />Bellows <br />Buna N, rubber <br />Spill container <br />Oval flange <br />SNAP -TIGHT COVER <br />Figure P1 <br />1) Cut the 4 inch N.P.T. Product Riser Pipe to Length and Install <br />the <br />le cover <br />GAL. <br />GAL. <br />GAL. <br />a) The length of the product riser pipe will vary depending upon the size of the spill container and <br />the depth of the underground storage tank. Regardless of these variables, the product riser <br />pipe must be cut such that the distance from the top of the product tank riser to the finish grade <br />is 19 inches (plus or minus %2 inch) for the 5 -gallon product spill container; 30 inches (plus or <br />minus'/2 inch) for the ten (10) gallon product spill container; and 37 inches (plus or <br />minus '/z inch) for the fifteen (15) -gallon product spill containers. <br />b) To determine the length of the product riser pipe, measure the distance from finish grade to the <br />top of the tank bung. Deduct: <br />19 inches (plus or minus'/2 inch) for the five (5) gallon vapor spill containers. <br />30 inches (plus or minus'/2 inch) for the ten (10) 15 gallon vapor spill containers. <br />37 inches (plus or minus % inch) for the fifteen (15) gallon vapor spill containers. <br />b) Once the proper riser length is established, use a roller style, 2 -blade pipe cutter to ensure a flat <br />square cut across the top of the product riser. DO NOT USE A HACKSAW TO CUT RISER <br />PIPE RISER. Verify squareness with a T-square or bevel. <br />d) Cut tapered N.P.T. threads on both ends of the product riser for a minimum length of <br />1 1/8 inches. <br />e) Ensure that a square, flush, smooth, sealing surface is achieved across the top of the product <br />riser pipe. De -burr and clean riser threads. <br />f) Apply a Teflon®, Fire Marshall approved thread sealing compound on the lower male threads of <br />the 4 inch product riser pipe. Manually tighten the product riser pipe into tank bung, then torque <br />to value specified in Table 2. <br />15627 ARROW HIGHWAY, IRWINDALE, CALIFORNIA 91706 <br />PHONE (626) 962-6646; OUT OF STATE CALLS (800) 4CNI-MFG; FAx (626) 962-4854 28 <br />WEBSITE: WWW.CNI-MFG.coM EMAIL: INFo(a)CNI-MFG.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.