Laserfiche WebLink
n <br />• <br />CNI Manufacturing Installation, Operation and Maintenance Manual (IOM) <br />Applicable to Executive Order VR -1 04-D <br />Belleau <br />Buna N,ruby <br />Spill container <br />oval <br />(K) <br />5/16"-18 X 1 1'/4" <br />Hex head Molts <br />Qty. 6 <br />(p3.1) <br />(TOP <br />Compression ging <br />Spill <br />container <br />T T f '_Ottorn <br />I (P3.2) <br />NOTE: The spill containment assembly is pre -assembled for ease of installation as shown above. <br />(Components of CON2-31103 are listed in the Exhibit 1 checklist contained in this Manual.) <br />3) Install Preassembled Product Containment Assembly (CON2-31103) <br />a) Apply a Teflon®, Fire Marshall approved thread sealing compound on the upper male threads of <br />the 4 inch riser pipe. <br />b) Manually tighten the complete product containment assembly (CON2-31103) (Fig. P3) onto the <br />4 inch riser pipe. <br />c) Use either the CNI Mfg. Containment Installation/Removal Tool (p/n EVRSYS116), or a chain <br />wrench with offset, and torque the oval flange onto the 4 inch product riser pipe to the value <br />specified in Table 1. . . <br />(NOTE: If the spill container must be removed from the oval flange in order to properly torque the <br />flange onto the 4 inch tank riser proceed to following steps i, ii, and iii.) <br />i) Inside the spill container there are six (6) hex head bolts and a compression ring that must <br />be removed (See Fig. P3.1). Once removed, lift the spill container to expose the oval flange. <br />ii) If using the CNI Mfg. Containment Installation/Removal Tool (p/n EVRSYS116) torque the <br />containment assembly and oval flange onto the 4 inch riser to the value specified in Table 2. <br />If a chain wrench with an offset is used, torque the oval flange onto the 4 inch tank riser to <br />the value specified in Table 2. <br />iii) Line up the spill containment assembly on the oval flange, and then align the compression <br />ring with the holes in the oval flange (See Fig. P3.2) and manually tighten the six hex head <br />bolts. Torque a little at a time in a cross over pattern for a correct seal, until you achieve <br />15 foot-pounds for each bolt each time (See Fig. P3.1). <br />15627 ARROW HIGHWAY, IRWINDALE, CALIFORNIA 91706 <br />PHONE (626) 962-6646; OUT OF STATE CALLS (800) 4CNI-MFG; FAX (626) 962-4854 30 <br />WEBSITE: WWW.CNI-MFG.coM EMAIL: INFOCCDCNI-MFG.COM <br />