My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> SWRCB,January 2002 Page 2 of 3 <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 9 Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 2Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Test Gauge 0 to 30 Equipment Rcsolution:.5 <br /> Piping Run#uo Bayi .Piping Run#UO Bay2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: r <br /> on Amron <br /> Piping Diameter: 2x3 <br /> Length of Piping Run: 40 55 <br /> Product Stored: Used Oil Used Oil <br /> Method and location of Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 mitt <br /> startin2 test: <br /> Test Start Time: 3 :00 pm 1:00 pm <br /> Initial Reading(Rj): 6 psi 6 p s i <br /> Test End Time: 4 :00 pm 2:00 pm <br /> Final Reading(RF): 6 psi 6 p s i <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-RO: 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: 8 Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br /> In Bay#1 replaced test boot in pit. Found stub up in drive with no cap for secondary. <br /> In Bay#2 found bad hose clamps on test boot in bay#2 pit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.