My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 of 3 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: L Piping Manufacturer 25 Industry Standard L Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ?S Pressure Li Vacuum L Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Test Tree/Guages Equipment Resolution:1/2"PSI <br /> Piping Run#87 Piping Run#Waste om Piping Run#wew oo van Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 311 3 It 311 <br /> Length of Piping Run: 1001 (approx) 401 (approx) 50 , (approx) <br /> Product Stored: Gasoline Used Oil - <br /> Method pipmg-run isolation:andlocationof «««<«Tes Boot/Piping Sump »»»» <br /> in - <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min 15 min 15 min <br /> starting test: <br /> Test Start Time: 11:07 am 1:25 pm 1:25 pm <br /> initial Reading(R,): 5 psi 5 psi 5 psi <br /> Test End Time: 12 :07 pm 2 :25 pm 2:25 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R, : None None None <br /> Pass/Fail Threshold or No PSI Loss No PSI Loss No PSI Loss <br /> Criteria: <br /> Test Resplt: 3 Pass ❑Fail 1 95 Pass ❑Fail EF Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.