My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 page 3 of 3 <br /> 7. UNDER-DISPENSER CONTAINMENT TESTING <br /> Test Methal Developed By: G UDC Manufacturer •S Industry Standard a Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure Vacuum 3Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:incon Sump Tester Equipment Resolution:.002 <br /> UDC#spa UDC#77a UDC# UDC# <br /> 7,Neight <br /> ufacturer: Bravo ravo <br /> rial: tee Stee <br /> he 1011 1011 <br /> m UDC Bottom to Top <br /> ofHi est Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to OK OK <br /> testin : <br /> Portion of UDC Tested 5 1/2 5 1/2 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both G Yes ❑No -NNA ❑Yes ❑No 6NA Q Yes No INA a Yes -No 0 NA <br /> product and water?` <br /> Turbine shutdown re onse time <br /> Is system programmed for fail- G Yes G No 9 NA ❑Yes ❑No 5NA h Yes 0 No rJ NA E Yes �?No —7;NA <br /> safe shutdown?` <br /> Was fail-safe verified to be ❑Yes G No -3 NA ❑Yes G No NAVA Yes r No !j NA 0 Yes ❑No D NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startine test 15 min 15 min <br /> Test Start Time: 2:04 pm 2:04 pm <br /> Initial Reading R): 1.6817 2.3103 <br /> Test End Time: 2:19 pm 2:19 pm <br /> Final Reading(RF): 1.6818 2.3099 <br /> Test Duration: 15 min 15 min <br /> ChanLe in Reading(RF-R,): .0001 .0003 <br /> Pass/Fail Threshold or Criteria: .002 .002 <br /> Test Result: E5 Pass ❑Fail 7A Pass ❑Fail ❑ Pass ❑Fail ❑ Pass 0 Fail <br /> Was sensor removed for testing? G Yes ❑No :&NA G Yes ❑No LONA G Yes G No ❑NA ❑Yes !�No 0 NA <br /> Was sensor properly replaced and <br /> verified functional ager testing? G Yes ❑No N NA ❑Yes G No PSNA ❑Yes G No ❑NA ❑Yes D No ❑NA <br /> COMMents—(include information on repairs made prior to testing, and recommended follow-up for ailed tests) <br /> Piping and electrical penetration come up through the bottom of the dispenser pan. <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.