Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +/-0.002" <br /> Piping Run#87 Piping Run#91 Piping Run# Piping Run# <br /> DIESEL VAPOR RECOVERY <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON AMERON AMERON <br /> Piping Diameter: 2"/3" 2"/3" 2"/3" 3"/4"&2"/3" <br /> Length of Piping Run: 120' 120' 120' 135' <br /> Product Stored: 87 91 DIESEL#2 VAPOR RECOVERY <br /> Method and location of TEST BOOT/STP TEST BOOT/STP TEST BOOT/STP TEST BOOT/STP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 8:00 AM 8:00 AM 8:00 AM <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 9:00 AM 9:00 AM 9:00 AM <br /> Final Reading(RF): 0.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(RF-RI): -5.0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ❑ Pass Z Fail ®Pass ❑ Fail ®Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> VAPOR RECOVERY LINE NOT TESTED, MISSING TEST BOOT INSIDE DIESEL STP SUMP <br /> UNABLE TO INSTALL TEST BOOT DUE TO ANGLE AND PIPING SIZE DIAMETER ON SECONDARY SIDE OF LINES <br /> NEEDS TEST BOOT INSTALLED <br /> 87 UNLEADED PRODUCT SECONDARY FAILED <br /> HELIUM PIN-POINT WILL BE REQUIRED FOR LOCATING LEAKS <br />