My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +/-0.002" <br /> Piping Run# Piping Run# Piping Run#M <br /> 87 VENT 91 VENT DIESEL VENT Piping Run# <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON AMERON <br /> Piping Diameter: 2"/3" 2"/3" 2"/3" <br /> Length of Piping Run: 85' 85' 85' <br /> Product Stored: 87 91 DIESEL#2 <br /> Method and location of TEST BOOT/STP TEST BOOT/STP TEST BOOT/STP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑Pass ❑Fail ❑Pass ❑ Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 91 DIESEL TANK VENT NOT TESTED DUE TO MISSING TEST BOOT <br /> UNABLE TO INSTALL TEST BOOT ONTO TANK VENT LINE DUE TO FLEX HOSE AND WERE THE SECONDARY LINE <br /> ENTERS THROUGH SUMP WALL PENETRATIONS <br /> 87 TANK VENT LINE NOT TESTED DUE TO NO TEST PORT INSTALLED ON TEST BOOT <br /> NEEDS NEW TEST BOOT INSTALLED <br />
The URL can be used to link to this page
Your browser does not support the video tag.