My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:55:25 AM
Creation date
6/3/2020 9:56:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2) <br /> rYPE OF ACTION ❑L NEW PLAN J§ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL-USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Nj-___Ci A 5 n I i nP. l 1 5;T'st <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) C R L L C / # 5446 3, <br /> BUSINESS SITE ADDRESS 1403 Country Club Blvd. E°3 CITY S t o c k t o n 104. <br /> II.;EQUIPMENT TESTING AND PREVENTIVE ENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR '2632 2634,263$,2641 _ <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY [399.OTHER(Specify): 4�3b <br /> III,MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLANlMAP SUBMITTED WIT THIS PLAN. Z.SITE PL PLANlhiAP PREYIOUSLY SUBMITTED, (23 CCR§2632, <br /> 2634 490.4 <br /> IV.TANK MONITORING IS PERFORMED USING T E FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 406-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b,LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4�1f <br /> -----_---_------- __...____ -_ __________ ........................._..........._..__.........___._._-----_.____._______-_--.---------------•....___._._-____----_.._...._....___.__..--_----._-.•- <br /> PANEL MANUFACTURER: V e e d e r Root 49°7, MODEL#: TLS-350 WlISD 491E-8 <br /> -----------------_ -•--__ _�. _____-__-_--____._____......_._-------__-.---------_-___.------------------------------------------- __ <br /> LEAK SENSOR MANUFACTURER: V e e d e r Root 490 9' MODEL#(S): 3 0 2 490-10 <br /> 2,AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKIS,)t(23 CCR§2643) 490-11 <br /> PANELMANUFACTURER: 490-12. MODEL#: 49(13 <br /> - _ ----------__-__-----------___ <br /> IN-TANK PROBE MANUFACTURER: 44°-14 MODEL#(S): 49045 <br /> _ _............._._.__.___-_._______•-_..._.._.-_.._--______-_.. _ _M_._.____r_.__._-______.._--- <br /> ._--- <br /> _.___.__.-_-_--.--------------_-__. __.-----___.__-._ <br /> LEAKTESTFREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c.WEEKLY 4s0Ie <br /> El d.MONTHLY ❑ e.-- <br /> PROGRAMMED TESTS: OTHER(Speci )._�-- 490 17 <br /> ❑ a.O.Ig.p,h. ❑ b.0.2g.p.h. ❑ c.OTHER 490.19 <br /> 49(19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49°-20 <br /> C34.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490is <br /> 5.TANK I.NTEGRITY TESTING(23 CCR§2643.1): 49023 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49024 i <br /> 490-25 ? <br /> ❑99.OTHER (Specify): 490-26 <br /> 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING E O ),(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPET PIPING SUMPS)AND 01'HEit SECONDARY GON CAINMEN'C W tTEd AUDEBLE AND 490-29 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER: V e e d e r Root 490-30 1 MODEL 490-31 <br /> I #: TLS-354 wlISD <br /> -.LEAK SENSOR MANUFACTURER: V e e d e f Root 490-32 MODEL#(S): 2 0$ 490-33 <br /> ____------__ ----- --._------------------_-___. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. KI a.YES ❑b.NO 49(34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. KI a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> ___ EaOgU4 r FGO HE`, t KAK Is DFTECTED(23 c! R! <br /> ---.... 490_36 <br /> MLLD MANUFACTURER(S): V 1 490-37 MODEL#(S): L D-2 0 0 0 490-39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> --____--__- ------------,----------___--------_____----------------------------__..._-----_-- <br /> ELLD MANUFACTURERS 490 40 490-41 <br /> � ) MODEL#(S): ................ <br /> ---------- -- <br /> PROGRAMMED IN LINT.LEAK"TEST: ❑ I.MINIMUM MONTHLY 0.2 h. 2.MINIMUM ANNUAL 0.1 490.42 <br /> g p• ❑ - g.p.h. <br /> EL LD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-Yf <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FRE UENCY a.ANNUALLY 0 b.EVERY 3 YEARS 0 c,OTHER(Specify) 49(46490-47 <br /> 5.VISUAL PIPE MONITORING. 49440 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* <br /> 49049 <br /> 'Allowed for mm�itorinm of urtbuned merz=cy genmtorfuel in oni r};'C 252$1..5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)1. 440.50 <br /> 7-NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99,OTHER(Specify) 490-52 <br /> 490.53 <br /> UPCF UST-D(12/2007)1!4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.