Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 oft) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54& <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 13 2.FLOAT AND CHAIN ASSEMBLY 11 3.ELECTRONIC STAND-ALONE 490-54b <br /> ❑4.NO DISPENSERS 0 99.OTHER iS i <br /> PANEL MANUFACTURER: -----°90-55 MODEL---- '190-56 <br /> -------—----------------------------------------- <br /> LEAK SENSOR MANUFACTURER. 490-11 -—-------- <br /> ---------- ' <br /> MODEL#(j)-. 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL AL"Rs- [I a.YES b­.NO­49-0-59— <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC Pump SHUTDOWN 0 a.YES El b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 a.YES 0 b,NO 49041 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. X a.YES 0 b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS IN 1.SINGLE-WALLED D 2 DOUBLE-WALLED 49'16_3 <br /> IF DOUBLE WALLED: _izWA_ <br /> UDC1N.T1-:RSTITIAL SPACE IS MONITORED BY: El 1,LIQUID 0 2.PRESSURE C]3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 0a.YES 0b,NO 49"-64b <br /> VII.PERIODIC SYSTEM TESTING — <br /> 0 1. ELD TESTING: THIS FACILITY HAS BEEN NO-TIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65, <br /> LEAK DEIEcTiols;(ELD)MUST BE'PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS��QILRED.(L3 CCR jqLA4.11......... <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 490-6-6- <br /> KP_1LE_H1JCIdTS ARE TESTED ANNUALLY. 4.9"T <br /> VIII.RECORDICEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490.68'1 N Visual Inspection Records 490.6Sb 0'rank integrity testing results 490-68C <br /> ❑SIR testing results(and supporting documentation records). 490-69d [I Tank gauging results(and supporting documentation records), 49o-68c <br /> 0 ATG Testing results(and supporting documentation records).490-61f 0 Corrosion Protection 60-day logs Omits <br /> Equipment maintenance and calibration records. 490-6sh <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> IN THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69C <br /> C3 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> C3 CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69t <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> C1 SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-693 <br /> El OTHER(Specify):m69h,m6gi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(IC <br /> The"Designated UST Operator—will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pageswithadditional information on specific monitoring procedures are attached to this plan.490.7i <br /> Ctmcntk.thcsNstem ovc;1'111 protccoon Is"Niechan1c;Jl Mapper valves aruyet at 9`,,0,the tank C:ipwllp" <br /> X1.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by- <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance. <br /> NAME Allen Faass 490-72 TITLE Tank and Pump Maintenace 490-73 <br /> NAME Allen Faass 490.74 TITLE 'resting <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the own 490-75 <br /> f any <br /> conditions that need follow-up action, <br /> X11.OWNEWOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge, <br /> JU-PhICANT SIGNATURE 490-76 DATE: <br /> 4W7 <br /> RLl!9=1a1Nfi�aLTmk Q!NM1XTftMwr 0 2 Faclig <br /> APPLICANT NAME(print); 4W79 <br /> APPLICANT TITLE, 49049 <br /> Allen Faass Compliance <br /> UIPCF ugr-l)(12/2007)3/4 <br /> L/ <br />