Laserfiche WebLink
SWRCB, January 2002 <br />• <br />9 SPILL/OVERFILL CONTAINMENT BOXES <br />Page _8_ of _8_ <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />❑ Other (Spec) <br />® Industry Standard ❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum ® Hydrostatic <br />Test Equipment Used: VISUAL <br />h. <br />— TAPE MEASURE <br />Spill Box # 91 FILL <br />p <br />Equipment Resolution: 1116" <br />Spill Box # 91 Spill Box # WASTE Spill Box # <br />VAPOR OIL FILL p <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />Bucket Depth: <br />17.25" <br />11.25" <br />16" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />8:15 <br />8:15 <br />8:30 <br />Initial Reading (Rj): <br />15.75" <br />9.75 <br />14.50" <br />Test End Time: <br />9:15 <br />9:15 <br />9:30 <br />Final Reading (RF): <br />15.75" <br />9.75" <br />14.50" <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />Test Result: <br />1 0 Pass ❑ Fail <br />® Pass <br />❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />rn iriSav`oG ci `a o voo <br />r O M 2 't7 rn -4 w <br />Z y S H 3 rN-7 T d �^ Z <br />v ins r�jrnmmna <br />