Laserfiche WebLink
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page _7_ of —8- <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />❑ Other (Spec) <br />® Industry Standard <br />❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: VISUAL - TAPE MEASURE Equipment Resolution: 1116" <br />r Spill Box #DIESEL Spill Box # DIESEL Spill Box # 87 <br />FILL VAPOR Spill Box # 87 FILL VAPOR <br />Bucket Diameter: 12" 12" 12" 12" <br />Bucket Depth: <br />12.25" 11.75' <br />12.25" <br />11.25" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 MIN 10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />8:15 8:15 <br />8:15 <br />8:15 <br />Initial Reading (R,): <br />10.75' 9.76" <br />10.75" <br />9.75' <br />Test End Time: <br />9:15 9:15 <br />9:15 <br />9:15 <br />Final Reading (RF): <br />10.76" 9.75" <br />10.75" <br />9.75" <br />Test Duration: <br />1 HR 1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF-R,): <br />0 0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS NO LOSS <br />NO LOSS <br />NO LOSS <br />Test Result: <br />® Pass ❑ Fail ® Pass <br />❑ Fail ®Pass <br />❑ Fail <br />® Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />