Laserfiche WebLink
F C E D <br />SWRCB, January 2002 0 Page _6— of —7- <br />8. FILL RISER CONTAINMENT SUMP TESTED T 2 1 2013 <br />Sump Diameter: <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />-Test <br />0.002" <br />+/-0.002" <br />+/-0.002" <br />+/-0.002" <br />Result, <br />Is there a sensor in the sump? <br />Q Pass F1 Fail <br />El Yes El No <br />El Pass F1 Fail <br />El Yes ❑ No <br />El Pass El Fail <br />El Yes El No <br />El Pass [I Fail <br />El Yes El No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />E]Yes E]No EINA <br />E]Yes E]No nNA <br />E]Yes []No [_-]NA <br />E]Yes E]No [:INA <br />Was sensor removed for testing? <br />El Yes El No n NA <br />[]Yes [:]No [--INA <br />QYes E]No [--INA <br />E]Yes E]No EINA <br />Was sensor properly replaced and <br />verified functional after testing?. <br />El Yes [:1 No El NA <br />E]Yes [:]No EINA <br />E]Yes E]No [:]NA <br />0 Yes El No El NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />