Laserfiche WebLink
D. Results of TestinglServicing <br />Software version Installed 329.01 JUN 2 20W <br />rinmnlptn the 1^iiA—i— K—wi— <br />Yes <br />Q Na' <br />Is the audible alarm operational? <br />Yes <br />❑ No* <br />15 the visual alarm aperatimnal? <br />Yes <br />❑ me <br />Were all sensors visually iftlpWed, functm3nally tested, and confimie4 oDerabonaI7 <br />Yes <br />t No' <br />Were all sensors instated at lowest point. of secondary Containment and positioned so that other equip4mr1l will not interfere wilh their propel <br />vpcwion� <br />❑ Yes <br />❑ No- <br />if alarms are relayed tit a remote —mritloringslat4n. is all communications equipment (e.g., modem) operalionaj? <br />NfA <br />El Yes <br />El No' <br />For pressurized piping systems, does the iurtinc- automatically shut down if the piping secondary containment rnonitfoning system de.,erAs a leak, <br />El NIA <br />fail!' , to 00Cn1to, of is electrically disconnected? If yes which sensors initiate positive shul-down) (Check 0 OW apply) 0 StImp)Trench <br />Sensors: El Disponsu Containment Sensors <br />Did you confirm Positive shul-down due 10 looks and sensor lailure;d1sconneclion? 0 Yes; 0 No. <br />yes <br />0 No' <br />For tank systems that utilize The mo.-kitoring system as the pnmary Lank overfill waming devicio (r.e., no mechanical overfill prevention valve is <br />NIA <br />insIxIect), is the overfill warning alarm vis,blo and audible at the tank rill point(s) and operating property? it so. at chat percen tof tank capao ty <br />does the alarm trigger? % <br />0 Yes <br />No <br />Was any monilionng equipment replaced? ir yes, identify spacific sensors, probes. or VMcr equipment replaced and list the manufaclurer nirr—�c <br />and model for all replacement parts in Section E, below <br />Dyes, <br />G) No <br />Was liquid found inside any sc-condary containment systems designed as Cry sysems? {Check aV 4Wt appPyj <br />I <br />1 <br />13 PrOducA; D Water. If yes. destribe uaiuses in Section E, belv-v <br />Yes <br />p NO <br />Vias monitoring system set-up reviewed to ensure proper settings? Anai;h set up relporls, if appuratxe <br />Yes <br />❑ Na' I <br />Is all monitoring eQuipmeni operational per manulacZurer's spec ifications7 <br />In Section E below, de -Witte Now and when these deficloocles were or will be cogreettd, <br />E. Comments: 91 Float on DiSp 3/1 needs repair and retest, <br />Also, Float on Disp 36 was stuck, we got it loose and retested with inspector present same <br />Monitoring System Certification <br />Page 2 of 4 <br />2.-12 IA)? <br />V1 <br />