Laserfiche WebLink
. , <br />F_ In -Tank Gauging / SIR Equipment: O C:e*this *vxmtank gauging ummmonly far inventory m^*m/ <br />O Check this box nnvlank uouumoofSIR ^yu/pnwnt/oinstalled. <br />TINS SecZjcn must be Completed i! in -lank gauging eQuipmen" , is used 10 Peff0cm ICA dclection monitoring <br />Complete the (0110voing checklist: <br />yes <br />NW <br />Has all Inuiu! wiring been irsPeCtPO for PrOM entry and leiminaWn, including testing for ground faults? <br />Yes <br />NW <br />Were all tank gauging PMbeS visually in5pected for dMage and residue build upi? <br />Yes <br />NO- <br />WOS accuracy of system product level feadings zeslad? <br />yes <br />El <br />INC <br />Was accuracy of System Water 10%.L4 feadinos lesled? <br />Yes <br />o <br />No* <br />we 811 probes reinsialle'd prowly? <br />Yes <br />MIA <br />eie an on lh� <br />Yes <br />Lino Leak Detectors (LLD): <br />0 Chock this box if LLDS are not installed <br />H. Comments: _____—_—' -------- ------- --------- ' ------' ------- <br />H <br />Yes <br />No' <br />Mre all LL confirmed OPOrational and accurate within regulatory roquirements? <br />NIA <br />0 Yes <br />D No' <br />For electronic LLDS, does the turbine autornalicalb/ shut off if the LLD detects a rea%? <br />MIA <br />Yes <br />No' <br />For clectfornt LLDs, does the turbine automatically shut oV if any portion Df the monitoring syszem is dis, d n, t <br />0 Yes <br />0 No <br />For electronic LLD$, does the tumine aulomatically shut off if any Porlion n'the monitonng system ma3functions or fairs a tc-st? <br />0 Yes <br />No' <br />For electronic I, LOs. have all accessible wring conneebons been visually inspiected? <br />NIA <br />H. Comments: _____—_—' -------- ------- --------- ' ------' ------- <br />H <br />