My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 1:49:12 PM
Creation date
6/3/2020 9:56:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br />F_ In -Tank Gauging / SIR Equipment: O C:e*this *vxmtank gauging ummmonly far inventory m^*m/ <br />O Check this box nnvlank uouumoofSIR ^yu/pnwnt/oinstalled. <br />TINS SecZjcn must be Completed i! in -lank gauging eQuipmen" , is used 10 Peff0cm ICA dclection monitoring <br />Complete the (0110voing checklist: <br />yes <br />NW <br />Has all Inuiu! wiring been irsPeCtPO for PrOM entry and leiminaWn, including testing for ground faults? <br />Yes <br />NW <br />Were all tank gauging PMbeS visually in5pected for dMage and residue build upi? <br />Yes <br />NO- <br />WOS accuracy of system product level feadings zeslad? <br />yes <br />El <br />INC <br />Was accuracy of System Water 10%.L4 feadinos lesled? <br />Yes <br />o <br />No* <br />we 811 probes reinsialle'd prowly? <br />Yes <br />MIA <br />eie an on lh� <br />Yes <br />Lino Leak Detectors (LLD): <br />0 Chock this box if LLDS are not installed <br />H. Comments: _____—_—' -------- ------- --------- ' ------' ------- <br />H <br />Yes <br />No' <br />Mre all LL confirmed OPOrational and accurate within regulatory roquirements? <br />NIA <br />0 Yes <br />D No' <br />For electronic LLDS, does the turbine autornalicalb/ shut off if the LLD detects a rea%? <br />MIA <br />Yes <br />No' <br />For clectfornt LLDs, does the turbine automatically shut oV if any portion Df the monitoring syszem is dis, d n, t <br />0 Yes <br />0 No <br />For electronic LLD$, does the tumine aulomatically shut off if any Porlion n'the monitonng system ma3functions or fairs a tc-st? <br />0 Yes <br />No' <br />For electronic I, LOs. have all accessible wring conneebons been visually inspiected? <br />NIA <br />H. Comments: _____—_—' -------- ------- --------- ' ------' ------- <br />H <br />
The URL can be used to link to this page
Your browser does not support the video tag.