My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 A'' <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> VI, DISPENSER MONITORING <br /> FMONITORING OF AREAS BF.NF.ATII DISPENSER(S)IS PERFORMED USING'THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1 ❑ 1 CON I INUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANE.[.MANUFACTURER: <br /> "j5'' MODI.,I, <br /> LF;.AK SENSOR MANUFACTURERrotsa- MODEL#(S)' v sa <br /> I <br /> WI ,L DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBT.F.AND VISUAI.ALARMS" ❑ a YES ❑ b NO v" <br /> WILL,A UDC I.EAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b NO <br /> WILL.I'All,URE/DISCONNE:CTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN' E] a.YES ❑ h NO �`7 � <br /> 2 MECHANICAL ASSEMBLY ie.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASK OF LEAK <br /> ASSEMBLY MANUFACTURER MOI)E..I.N(S) (JLre i 'zc\ ` <br /> l S('AL MONITORING DONE Ej a DAILY ❑ b.WEEKLY(Recwre agencyapprovab fir. <br /> ❑ T NO DISPENSERS v i <br /> ❑ 99 0riiER(Specify) - <br /> --__-- — VII. ENHANCED LEAK DETECTION <br /> F;�q <br /> WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLFMENT FNHANCED LEAK <br /> DFITEC-1 ION(ILD)FOR']'HE UST(S)COVERED BY THIS PLAN PER 23 CCR§2644.1,F..L.D IS PERFORMED EVERY 36 MONTHS AS REQUIRED— I <br /> — ------- VIII. TRAINING <br /> RI J:FRFNCE DOCUMENT'S MAINTAINEiD AT FACILITY(Check all that apply) <br /> I L9 THIS UNDERGROUND STORAGE TANK MONI'T'ORING PLAN(Required) <br /> } � I OPERA MANUALS FUR ELECTRONIC MONITORING I:QUIPMFN'I'{Required) <br /> 3 H IF.FACILITY'S BEST MANAGFMENT PRACTICES(Required as o[1/01/2(105) j <br /> 4 ELI CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> fi ❑ S'F,A'TE WA'T'ER RESOURCES CON'iROL BOARD (SWRCB) PUBLICATIO:S: "HANDBOOK FOR "TANK OWNERS - MANUAL AND <br /> S'I ATISTTICAL INVENTORY RECONCILIATION- <br /> 7 SWRCS PUBLICATION '-WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS- <br /> xei <br /> ! 4y (-� OTHER(Specify). <br /> Personnel with UST monitoring responsibilities are tamiiiar with all of the above documents relevant to their job duties and can access those documents when needed <br /> By January I.2005 this facility will have a"Designated UST Operator'who has passed the operator exam administered by the International Code Council(ICC) 13y <br /> .tanua;y 1.2005. -,d annually thereafter,the "Designated UST Operator"will train facility in the ro er o eration and maintcnance of the UST systems j <br /> y g 1 YP P p" <br /> j Tris training vv:il:ndcde,but is not limited to,the following: <br /> o- Operation of the UST systems in a manner consistent with the lacilitv's best management practices. <br /> "I'he a:;ility employee's role with regard to the leak detection equipment. <br /> I <br /> Tnc facthly employee's role with regard to spills and overfills. <br /> Whom to Contact for emergencies and leak detection alarms. <br /> For facihtti_emp!ovees hired on or after.lanuary 1,2005.the initial training will Lie conducted within 30 days of the date of hire. �I <br /> — <br /> Ix. COMMENTS/ADDITIONAL L IN'k'ORMATION <br /> I ('lease use this section to include any additional[1ST system monitoring-related information(e.g.,additional information required by your local agency) rHs i <br /> �_<' � t �.� '-� �C�v e,�.: r<.. fie:?. `-+ 4- <br /> i q <br /> ___.__._— X. PERSONNEL RESPONSIBILITIES <br /> 1S OF 111107. THF. -DESIGNATED [IST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATIOP� <br /> CII ;I'Y r OR'>9 WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DI:TE:CTION <br /> F'OtjIPMElti I COVERED BY THIS PLAN.AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAI.INSPLiCI'IONS OF THE FACILI it'S <br /> __S"SYSTEMS IN ACCORDANCE:WITH 23 CCR§2715(b) ——� <br /> -- %I, OWNER/OPERATOR SIGNATURE <br /> I ('E HFiC ATION: [certify that the information provided herein is true and accurate to the best of my knowledge. <br /> l 0WNTVR/Ol FeRATOR ,tGnIAG R:' -- REPRESENTING DATE: <br /> Owner arm I A cc �L <br /> ❑Operator e <br /> v r. <br /> t)64y,}:ZION nAIURNA_M (prtinti OWNF..RlOPERATORTITLE <br /> � !a;rrrcv Use . <br /> Orriv/�-� 'Itis plat?has beEl reviewed and: Approved Approved With Conditions Disapproved <br /> ' � to <br /> j Locc,l Acency Signature 9 1 -- —_-- -- Date: <br /> I <br /> Con?^rants?4pecia!Conations <br /> �.sC1 TIT-d(()7!03)-.414_� ---- — 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.